| Contract |
In all room areas where vanity is removed, cut carpet straight across the back of the room & install new… |
$168,963 |
Warner Robins |
GA |
4 |
0 |
| Contract |
Enclose open storage bays east of the existing closed bay siding panel. Install siding and new doors as located on… |
$244,752 |
Warner Robins |
GA |
0 |
0 |
| Contract |
Remove 28 each existing 120 volt, 150 watt high pressure sodium light fixtures in the basketball court area of B.… |
$9,177 |
Warner Robins |
GA |
3 |
0 |
| Contract |
1. Install a light in the tub/shower area and tie new light into existing light switch 2. Demo existing light… |
$168,963 |
Warner Robins |
GA |
2 |
0 |
| Contract |
SCOPE OF WORK: Renovate restrooms 1.Men’s restroom a. Demo partitions and urinal screen b. Demo VCT floor tile and cove… |
$31,479 |
Warner Robins |
GA |
0 |
0 |
| Contract |
Exterior - Install cantilevered canopies over all exterior rollup doors. Paint Exterior of Building. Demo & replace roof & install… |
$329,517 |
Warner Robins |
GA |
3 |
0 |
| Contract |
Provide labor, material, equipment, supplies and coordination required to provide a design package consisting of constuction drawings, specifications and submittals.… |
$65,017 |
Warner Robins |
GA |
1 |
0 |
| Contract |
Demo urinals, commodes, lavatories, faucets, partitions, light fixtures, switches, receptacles, doors, door hardware, mirrors, & loose floor tile.Clean all lines… |
$234,136 |
Warner Robins |
GA |
0 |
0 |
| Contract |
Install a 2 status display panel in the main control room of B. 177 that is capable of displaying the… |
$36,669 |
Warner Robins |
GA |
3 |
0 |
| Contract |
Remove 69 each, 2' x 4' T12 ligh fixtures. Install 67 each new 2' x 4', 3 tube T8 light… |
$13,820 |
Warner Robins |
GA |
3 |
0 |
| Contract |
Provide energy efficient lighting, Remove and Demo all light fixtures rooms 140, 141 145, 157, 159 and library and sub… |
$34,988 |
Warner Robins |
GA |
2 |
0 |
| Contract |
Design Build Services for the Space Alteration for 2 New 7th Floor Judges Chambers |
$906,740 |
Tampa |
FL |
1 |
-2 |
| Contract |
• Remove and construct new handrails at Bldg 300 on the center loading area between the two wings. • New… |
$168,963 |
Warner Robins |
GA |
1 |
0 |
| Contract |
Demo existing Rickard type supply air diffusers and duct mounted static pressure sensor. Remove return air grills, ceiling tile, grid,… |
$92,880 |
Warner Robins |
GA |
3 |
0 |
| Contract |
Extend the sand filter backwash piping from the lift station #23 to the head of the plant, install new trickling… |
$95,701 |
Warner Robins |
GA |
3 |
0 |
| Contract |
Not Started |
$5,913,251 |
Laughlin A F B |
TX |
0 |
-2 |
| Contract |
Renovate Admin. Area and Restrooms:Demo lights, ceiling tile, heat detectors, carpet and cove base, HVAC supply and returns, Two restrooms,… |
$82,299 |
Warner Robins |
GA |
0 |
0 |
| Contract |
Options for all areas: Paint over existing wallcovering. Patch areas as required. One coat of tinted primer and two finish… |
$412,724 |
Warner Robins |
GA |
0 |
0 |
| Contract |
Remove and replace stack cap on boiler # 2 with larger diameter. Replace tie down cables and hardware on 4… |
$29,305 |
Warner Robins |
GA |
1 |
0 |
| Contract |
Construct Bus Shetler & Sidewalks 170 Calendar Days |
$220,789 |
San Antonio |
TX |
3 |
1 |