SPRING, TX

Rods Surveying Inc

Total Received: $608,908.00 (sub-recipient) - Visit on the Web

Below you will find all the contracts, grants, and loans received by Rods Surveying Inc as of October 30, 2009. You can sort by the different table columns. Click on an item for more information and to comment and vote on the item.

Sub Recipient

Type Description Amount City State Jobs Vote
Contract Scope of work including providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a… $438,187 Mcallen TX N/A -3
Contract Scope of work is for the aerial and design survey for the design of rehabiliatation improvements for the Upper Rio… $83,422 Mcallen TX N/A -1
Contract The proposed work is for the re-design of the Lower Rio Grande Flood Control Project - Hidalgo Protective Levee -… $3,226 Mcallen TX N/A 0
Contract Aerial Survey for Design of Rehabilitation Improvements for the Lateral A to Donna Pump to Retamal Dam Levee Reach Within… $81,226 Mcallen TX N/A 0
Contract The proposed work is for the re-design of the Lower Rio Grande Flood Control Project - Hidalgo Protective Levee -… $2,847 Mcallen TX N/A 0