| Contract |
The American Recovery and Reinvestment Act of 2009 (ARRA) has allocated funding for the design and modernization of the 10… |
$550,500 |
Chicago |
IL |
N/A |
-2 |
| Contract |
A heating/cooling load study was conducted for the Federal Courthouse in Davenport, Iowa to evaluate the mechanical system zoning in… |
$14,688 |
Davenport |
IA |
N/A |
0 |
| Contract |
A masterplan is being prepared for the Cafeteria kitchen of the Neal Smith Federal Building in Des Moines, Iowa. This… |
$8,638 |
Des Moines |
IA |
N/A |
-1 |
| Contract |
Pre-design study to evaluate a 'retro-commissioning' report prepared by Teng Associates summarizing possible energy conservation and monitoring measures to be… |
$45,444 |
Des Moines |
IA |
N/A |
0 |
| Contract |
Repair Mechanical Systems, DFRC; Repair Greenhouse Cooling System, CCRU, Madison WI |
$43,438 |
Madison |
WI |
N/A |
0 |
| Contract |
Energy performance enhancements to the Sioux City Federal Building which may include improvements to the mechancial, electrical, and enclosure systems… |
$124,930 |
Sioux City |
IA |
N/A |
0 |
| Contract |
Supplemental Architect/Engineering Services: Re-Commissioning Report and Construction Document Delivery |
$80,040 |
Urbana |
IL |
N/A |
0 |