| Contract |
Building 115 Roof Replacement. To provide labor, equipment and material to replace existing Built-Up Roof (BUR) system on the mid… |
$263,893 |
Whiteman Air Force Base |
MO |
1 |
0 |
| Contract |
Dock 10 Roof. To provide labor, equipment and material to replace existing EPDM roofing material with TPO roofing system on… |
$214,086 |
Whiteman Air Force Base |
MO |
1 |
0 |
| Contract |
Dock 11 Roof Replacement. To provide labor, equipment and material to replace existing EPDM roofing material with TPO roofing system… |
$214,086 |
Whiteman Air Force Base |
MO |
1 |
0 |
| Contract |
Dock 12 Roof Replacement. To provide labor, equipment and material to replace existing EPDM roofing material with TPO roofing system… |
$214,086 |
Whiteman Air Force Base |
MO |
1 |
-1 |
| Contract |
Docks 3, 5, 7 Low Roofs. To provide labor, equipment and material to replace existing EPDM roofing material with TPO… |
$216,826 |
Whiteman Air Force Base |
MO |
1 |
0 |
| Contract |
Hangar 27 Roof. To provide all labor, material, and equipment to replace existing EPDM roofing material with TPO roofing system… |
$340,047 |
Whiteman Air Force Base |
MO |
1 |
0 |
| Contract |
Hangar 91 Roof Repair. To provide all labor, material, and equipment to repair the roof of Hangar 91. |
$235,445 |
Whiteman Air Force Base |
MO |
1 |
1 |
| Contract |
Install Reflective Coating, Building 1392. Furnish all plant, labor, materials, and equipment, and perform all operations required to install high… |
$268,800 |
Eglin Afb |
FL |
1 |
0 |
| Contract |
Repair Roof Bldg 90747. Furnish all labor, tools, equipment, materials, facilities, and transportation necessary to Repair Roof to Building 90747… |
$148,380 |
Hurlburt Field |
FL |
1 |
0 |
| Contract |
Repair Roof Bldg 91130. Furnish all labor, tools, equipment, materials, facilities, and transportation necessary to repair the roof on building… |
$109,289 |
Hurlburt Field |
FL |
1 |
-9 |
| Contract |
Repair Roofs at Buildings 90002, 90050, 90331, 90121, 90145, 90333, 90503, 90700, 90710. Furnish all labor, tools, equipment, materials, facilities,… |
$299,839 |
Hurlburt Field |
FL |
1 |
-3 |
| Contract |
Replace Roof Bldg 91147. Furnish all labor, tools, equipment, materials, facilities, and transportation necessary to Replace Roof Bldg 91147 at… |
$136,219 |
Hurlburt Field |
FL |
1 |
0 |