| Contract |
PAVE BURGER KING PARKING LOT, FIX STRIPPING. |
$187,143 |
Edwards |
CA |
0 |
-5 |
| Contract |
Construct Guard House Roof |
$91,208 |
Edwards |
CA |
1 |
-4 |
| Contract |
Replace HVAC Unnit @ Bldg 10400 |
$926,900 |
Lompoc |
CA |
0 |
-2 |
| Contract |
Install new concrete pad for dumpster access. |
$9,862 |
Eglin Afb |
FL |
2 |
-2 |
| Contract |
INSTALL 62 STOAGE CAGES @ BLDG 13135 |
$40,310 |
Lompoc |
CA |
0 |
-1 |
| Contract |
Plumbing systems, Site preparation, Site plumbing utilities and general requirements. |
$1,238,193 |
Edwards |
CA |
0 |
-1 |
| Contract |
Replacement of existing interior light fixtures and exterior light fixtures with new energy-efficent flurescent fixtures and the disposal of all… |
$103,812 |
Edwards |
CA |
0 |
-1 |
| Contract |
Site preparation, site earthwork, site improvements. |
$91,302 |
Edwards |
CA |
1 |
-1 |
| Contract |
Install new power, fire alarm and HVAC to existing building. |
$89,890 |
Eglin Afb |
FL |
7 |
-1 |
| Contract |
Site Demolition and Interior Construction |
$267,128 |
Edwards |
CA |
3 |
-1 |
| Contract |
Remove old flooring and install new epoxy floor coating system in Bldg. 8640. |
$295,532 |
Eglin Afb |
FL |
8 |
-1 |
| Contract |
Install new communication equipment to remote water well sites. |
$298,901 |
Eglin Afb |
FL |
4 |
0 |
| Contract |
Replacing all lamps in existing interior flurescent light fixtures and provide and install new controls in offices. |
$150,830 |
Edwards |
CA |
1 |
0 |
| Contract |
Replace existing transformer |
$14,572 |
Eglin Afb |
FL |
2 |
0 |
| Contract |
Removal of existing pole mounted transformer and installation of new pad mounted transformer. Manual transfer switch, electrical panel, conduit and… |
$163,813 |
Edwards |
CA |
1 |
0 |
| Contract |
Replacing all lamps in existing interior fluorescent light fixtures. Provide and install new controls in office areas and mechanical rooms |
$83,822 |
Edwards |
CA |
0 |
0 |
| Contract |
REPLACE A/C UNIT @ BLDG 11439 |
$207,002 |
Lompoc |
CA |
0 |
0 |
| Contract |
REPLACE TAXIWAY LIGHTS @ SOUTH ALPHA FACILITY 1771 |
$92,687 |
Lompoc |
CA |
0 |
0 |
| Contract |
Interior construction, Stairways, Interior finishes, Plumbing systems, Furnishings, Selective demolition and General Requirements. |
$164,477 |
Edwards |
CA |
1 |
0 |
| Contract |
Replacing all lamps, ballasts in existing interior flurescent light fixtures in the building and to provide and install new controls… |
$194,973 |
Edwards |
CA |
1 |
0 |