| Contract |
Replace HVAC Unnit @ Bldg 10400 |
$926,900 |
Lompoc |
CA |
0 |
-2 |
| Contract |
INSTALL 68 CEILING FANS @ BLDG 13135 |
$33,887 |
Lompoc |
CA |
0 |
0 |
| Contract |
REPLACE TAXIWAY LIGHTS @ SOUTH ALPHA FACILITY 1771 |
$92,687 |
Lompoc |
CA |
0 |
0 |
| Contract |
Replace existing interior light fixtures and exterior light fixtures w/new energy-efficient flurescent fixtures. |
$546,402 |
Edwards |
CA |
0 |
0 |
| Contract |
PAVE BURGER KING PARKING LOT, FIX STRIPPING. |
$187,143 |
Edwards |
CA |
0 |
-5 |
| Contract |
INSTALL 62 STOAGE CAGES @ BLDG 13135 |
$40,310 |
Lompoc |
CA |
0 |
-1 |
| Contract |
Roof construction, painting, selective demolition & general requirements. |
$34,580 |
Edwards |
CA |
0 |
0 |
| Contract |
installation of a permantely-mounted emergency generator to power the area lighting |
$663,113 |
Edwards |
CA |
0 |
0 |
| Contract |
Plumbing systems, Site preparation, Site plumbing utilities and general requirements. |
$1,238,193 |
Edwards |
CA |
0 |
-1 |
| Contract |
MC Construct Concrete Pad |
$21,915 |
Edwards |
CA |
0 |
0 |
| Contract |
Replacement of existing interior light fixtures and exterior light fixtures with new energy-efficent flurescent fixtures and the disposal of all… |
$103,812 |
Edwards |
CA |
0 |
-1 |
| Contract |
Replace Base Water Valves |
$634,880 |
Lompoc |
CA |
0 |
0 |
| Contract |
Replace all existing interior light fixtures inside the building w/new energy efficient fluorescent light fixtures. |
$252,337 |
Edwards |
CA |
0 |
0 |
| Contract |
Replacing all lamps in existing interior fluorescent light fixtures. Provide and install new controls in office areas and mechanical rooms |
$83,822 |
Edwards |
CA |
0 |
0 |
| Contract |
REPLACE A/C UNIT @ BLDG 11439 |
$207,002 |
Lompoc |
CA |
0 |
0 |
| Contract |
REPAIR COMM GATR SITE @ BLDG 51 |
$205,664 |
Lompoc |
CA |
0 |
0 |
| Contract |
Construct Guard House Roof |
$91,208 |
Edwards |
CA |
1 |
-4 |
| Contract |
Interior construction, Stairways, Interior finishes, Plumbing systems, Furnishings, Selective demolition and General Requirements. |
$164,477 |
Edwards |
CA |
1 |
0 |
| Contract |
objective: eliminate septic and holding tanks by provide access to a gravity sewer along Contractor's Row. |
$252,293 |
Edwards |
CA |
1 |
0 |
| Contract |
Replacing all lamps, ballasts in existing interior flurescent light fixtures in the building and to provide and install new controls… |
$194,973 |
Edwards |
CA |
1 |
0 |