| Contract |
Site Demolition and Interior Construction |
$267,128 |
Edwards |
CA |
3 |
-1 |
| Contract |
Construct Guard House Roof |
$91,208 |
Edwards |
CA |
1 |
-4 |
| Contract |
Replace existing interior light fixtures and exterior light fixtures w/new energy-efficient flurescent fixtures. |
$546,402 |
Edwards |
CA |
0 |
0 |
| Contract |
Interior construction, Stairways, Interior finishes, Plumbing systems, Furnishings, Selective demolition and General Requirements. |
$164,477 |
Edwards |
CA |
1 |
0 |
| Contract |
objective: eliminate septic and holding tanks by provide access to a gravity sewer along Contractor's Row. |
$252,293 |
Edwards |
CA |
1 |
0 |
| Contract |
PAVE BURGER KING PARKING LOT, FIX STRIPPING. |
$187,143 |
Edwards |
CA |
0 |
-5 |
| Contract |
Replacing all lamps, ballasts in existing interior flurescent light fixtures in the building and to provide and install new controls… |
$194,973 |
Edwards |
CA |
1 |
0 |
| Contract |
Replacing all lamps in existing interior flurescent light fixtures and provide and install new controls in offices. |
$150,830 |
Edwards |
CA |
1 |
0 |
| Contract |
Roof construction, painting, selective demolition & general requirements. |
$34,580 |
Edwards |
CA |
0 |
0 |
| Contract |
installation of a permantely-mounted emergency generator to power the area lighting |
$663,113 |
Edwards |
CA |
0 |
0 |
| Contract |
Plumbing systems, Site preparation, Site plumbing utilities and general requirements. |
$1,238,193 |
Edwards |
CA |
0 |
-1 |
| Contract |
MC Construct Concrete Pad |
$21,915 |
Edwards |
CA |
0 |
0 |
| Contract |
Replacement of existing interior light fixtures and exterior light fixtures with new energy-efficent flurescent fixtures and the disposal of all… |
$103,812 |
Edwards |
CA |
0 |
-1 |
| Contract |
Removal of existing pole mounted transformer and installation of new pad mounted transformer. Manual transfer switch, electrical panel, conduit and… |
$163,813 |
Edwards |
CA |
1 |
0 |
| Contract |
Replace all existing interior light fixtures inside the building w/new energy efficient fluorescent light fixtures. |
$252,337 |
Edwards |
CA |
0 |
0 |
| Contract |
Site preparation, site earthwork, site improvements. |
$91,302 |
Edwards |
CA |
1 |
-1 |
| Contract |
Replace existing interior lighting |
$122,628 |
Edwards |
CA |
1 |
0 |
| Contract |
Replacing all lamps in existing interior fluorescent light fixtures. Provide and install new controls in office areas and mechanical rooms |
$83,822 |
Edwards |
CA |
0 |
0 |
| Contract |
Remove old joint sealant and replace with new LOX sealant. The purpose is to facilitate government testing. |
$4,285 |
Eglin Afb |
FL |
2 |
0 |
| Contract |
Install new waterline to Bldg. 130 for washing town test station for aircraft. |
$6,810 |
Eglin Afb |
FL |
2 |
0 |