| Contract |
Remove old joint sealant and replace with new LOX sealant. The purpose is to facilitate government testing. |
$4,285 |
Eglin Afb |
FL |
2 |
0 |
| Contract |
Install new waterline to Bldg. 130 for washing town test station for aircraft. |
$6,810 |
Eglin Afb |
FL |
2 |
0 |
| Contract |
Install new concrete pad for dumpster access. |
$9,862 |
Eglin Afb |
FL |
2 |
-2 |
| Contract |
Replace existing transformer |
$14,572 |
Eglin Afb |
FL |
2 |
0 |
| Contract |
MC Construct Concrete Pad |
$21,915 |
Edwards |
CA |
0 |
0 |
| Contract |
INSTALL 68 CEILING FANS @ BLDG 13135 |
$33,887 |
Lompoc |
CA |
0 |
0 |
| Contract |
Roof construction, painting, selective demolition & general requirements. |
$34,580 |
Edwards |
CA |
0 |
0 |
| Contract |
INSTALL 62 STOAGE CAGES @ BLDG 13135 |
$40,310 |
Lompoc |
CA |
0 |
-1 |
| Contract |
Replacing all lamps in existing interior fluorescent light fixtures. Provide and install new controls in office areas and mechanical rooms |
$83,822 |
Edwards |
CA |
0 |
0 |
| Contract |
Install an new generator and transfer switch to operate water well. |
$88,267 |
Eglin Afb |
FL |
3 |
0 |
| Contract |
Install new power, fire alarm and HVAC to existing building. |
$89,890 |
Eglin Afb |
FL |
7 |
-1 |
| Contract |
Construct Guard House Roof |
$91,208 |
Edwards |
CA |
1 |
-4 |
| Contract |
Site preparation, site earthwork, site improvements. |
$91,302 |
Edwards |
CA |
1 |
-1 |
| Contract |
REPLACE TAXIWAY LIGHTS @ SOUTH ALPHA FACILITY 1771 |
$92,687 |
Lompoc |
CA |
0 |
0 |
| Contract |
Replacement of existing interior light fixtures and exterior light fixtures with new energy-efficent flurescent fixtures and the disposal of all… |
$103,812 |
Edwards |
CA |
0 |
-1 |
| Contract |
Replace existing interior lighting |
$122,628 |
Edwards |
CA |
1 |
0 |
| Contract |
Replacing all lamps in existing interior flurescent light fixtures and provide and install new controls in offices. |
$150,830 |
Edwards |
CA |
1 |
0 |
| Contract |
Removal of existing pole mounted transformer and installation of new pad mounted transformer. Manual transfer switch, electrical panel, conduit and… |
$163,813 |
Edwards |
CA |
1 |
0 |
| Contract |
Interior construction, Stairways, Interior finishes, Plumbing systems, Furnishings, Selective demolition and General Requirements. |
$164,477 |
Edwards |
CA |
1 |
0 |
| Contract |
PAVE BURGER KING PARKING LOT, FIX STRIPPING. |
$187,143 |
Edwards |
CA |
0 |
-5 |