| Contract |
Initial deployment site assessment for accelerated ResSIM Modeling Assistance for Mobile District Manual Update Studies, dated July 2009. |
$43,648 |
Bellevue |
WA |
0 |
0 |
| Contract |
Dam Safety Analysis of Spillway Capacity under Conditions of Probable Maximum Flood - Lake Washington Ship Canal and Hiram M.… |
$184,930 |
Bellevue |
WA |
0 |
0 |
| Contract |
Accelerated CWMS deployment for Apalachicola-Chattahoochee-Flint Basin, dated September 2009 |
$601,894 |
Bellevue |
WA |
0 |
0 |
| Contract |
Revision to Howard Hanson Dam Water Control Manual |
$214,849 |
Bellevue |
WA |
0 |
0 |
| Contract |
Dry Bypass and Oxbow Model Update and Conceptual Design for Napa River/Napa Creek Flood Protection Project, Napa County, CA. Significant… |
$425,954 |
Napa |
CA |
1 |
0 |
| Contract |
A conceptual design for the Dry Bypass Pump Station was provided in the Final Supplemental General Design Memorandum (GDM) with… |
$304,799 |
Napa |
CA |
1 |
0 |
| Contract |
The Purpose of the project is to replace eleven existing stream structures on Esmond, Hawley and Buck Creeks. Most of… |
$25,000 |
Salem |
OR |
1 |
0 |
| Contract |
The Architect-Engineer (A-E) shall update and expand the limits of an existing HEC-1 and UNET models for the Morganza to… |
$151,487 |
Salem |
OR |
1 |
0 |
| Contract |
The Corps Water Management System (CWMS) is the automated hydrometeorologic data, modeling, and communication system used by the U.S. Army… |
$474,861 |
San Diego |
CA |
1 |
2 |
| Contract |
Initial deployment site assessment for accelerated CWMS Deployment for the Districts of Los Angeles, Omaha and Mobile |
$92,084 |
San Diego |
CA |
0 |
2 |
| Contract |
Lewis & Clark Lake Headwaters Aggradation Evaluation. The closure of Gavins Point Dam on the Missouri River at river mile… |
$352,437 |
San Diego |
CA |
1 |
1 |
| Contract |
The Corps Water Management System (CWMS) is the automated hydrometeorologic data, modeling, and communication system used by the U.S. Army… |
$283,414 |
San Diego |
CA |
0 |
1 |