| Grant |
RESURFACING AND RELATED WORK ON ROUTE 6A |
$3,150,634 |
Barnstable |
MA |
0 |
1 |
| Grant |
RESURFACING AND RELATED WORK ON ROUTE 122 & ROUTE 62 |
$2,268,246 |
Barre |
MA |
9 |
0 |
| Grant |
RESURFACING AND RELATED WORK ON ROUTE 9 |
$4,699,691 |
Belchertown |
MA |
7 |
0 |
| Grant |
BRIDGE ST RECONSTRUCTION. SEE ALSO STP |
$8,529,498 |
Boston |
MA |
0 |
1 |
| Grant |
COLD PLANING AND RESURFACING AT VARIOUS LOCATIONS |
$5,074,035 |
Boston |
MA |
11 |
0 |
| Grant |
RECLAMATION OF ATHOL, RICHMAND RD (RTE 32) FROM ELM AVE TO NH SL. |
$1,000,000 |
Boston |
MA |
0 |
0 |
| Grant |
FOOTPRINT ROAD REHAB PROJECT RTE 169(NO.WOODSTOCK RD) SEE ALSO STP |
$2,000,000 |
Boston |
MA |
0 |
0 |
| Grant |
FIBER OPTIC CONNECT 3 LOC CAMBRIDGE RT 2-MBTA ALEWIFE, NEWTON REST AREA RT.128 TO MBTA, FRAMINGHAM |
$1,400,000 |
Boston |
MA |
0 |
0 |
| Grant |
DESIGN-BUILD INTERCHANGE CONSTRUCTION OF ROUTE 24. |
$70,172,997 |
Boston |
MA |
1 |
0 |
| Grant |
NORTH BANK BRIDGE (B-16-302 - C-1-8) RIVER WALK / CHARLES RIVER |
$35,526,290 |
Boston |
MA |
0 |
4 |
| Grant |
RESURFACING AND RELATED WORK |
$3,523,180 |
Boston |
MA |
0 |
0 |
| Grant |
INTERSECTION AND SIGNAL IMPROVEMENTS ON DORCESTER AVE. |
$15,729,549 |
Boston |
MA |
0 |
-1 |
| Grant |
CCTV INSTALLATION OF SIGNALIZED INTERSECTIONS (ITS) |
$1,613,346 |
Boston |
MA |
0 |
0 |
| Grant |
HYANNIS TERMINAL SLIP IMPROVEMENTS |
$5,000,000 |
Boston |
MA |
0 |
0 |
| Grant |
VIDEO SYSTEM UPGRADES IP BASED VIRTUAL MATRIX SWITCH (ITS) SEE STP |
$1,000,000 |
Boston |
MA |
0 |
0 |
| Grant |
COMMUNICATION EQUIPMENT INSTALLATION AT 5 LOCATIONS & FIBER OPTIC CONNECTION EXISTING CONDUIT 3 LOCA |
$908,172 |
Boston |
MA |
0 |
0 |
| Grant |
USFS Native Species Ecological Restoration |
$538,000 |
Boston |
MA |
0 |
0 |
| Grant |
USFS Southeastern Massachusetts Fuels Mitigation |
$1,974,000 |
Boston |
MA |
0 |
0 |
| Grant |
Home Delivered Nutrition Services |
$690,992 |
Boston |
MA |
0 |
0 |
| Grant |
Mass Energy Efficiency and Conservation Block Grant |
$14,752,100 |
Boston |
MA |
0 |
-1 |