| Contract |
A heating/cooling load study was conducted for the Federal Courthouse in Davenport, Iowa to evaluate the mechanical system zoning in… |
$15,461 |
Davenport |
IA |
1 |
0 |
| Contract |
Pre-design study to evaluate a 'retro-commissioning' report prepared by Teng Associates summarizing possible energy conservation and monitoring measures to be… |
$83,500 |
Des Moines |
IA |
0 |
0 |
| Contract |
Energy performance enhancements to the Sioux City Federal Building which may include improvements to the mechancial, electrical, and enclosure systems… |
$196,326 |
Sioux City |
IA |
0 |
0 |
| Contract |
A masterplan is being prepared for the Cafeteria kitchen of the Neal Smith Federal Building in Des Moines, Iowa. This… |
$20,735 |
Des Moines |
IA |
0 |
-1 |