| Contract |
TO 5082-Recovery-FTQW071071-Repair HVAC System, Base Operations. OMB guidance of 22 JUNE 2009 requires Federal Contractors report in accordance with FAR… |
$753,795 |
Eielson Afb |
AK |
0 |
0 |
| Contract |
TO 5088-Recovery-FTQW012542-Install fire protection in Hazmat Decon Facility (B4378) |
$93,812 |
Eielson Afb |
AK |
1 |
0 |
| Contract |
TO 5089-Recovery-FTQW071079-Repair H-Frame Transformer, CHPP Pump House |
$57,339 |
Eielson Afb |
AK |
1 |
0 |
| Contract |
TO 5086-Recovery-FTQW051015-Repair Existing Insulation and Siding at Launch Facility (B4231) |
$199,764 |
Eielson Afb |
AK |
1 |
0 |
| Contract |
TO 5085-Recovery-FTQW081508-Replace Siding, Windows, Doors, Inslulation (B3383). |
$262,509 |
Eielson Afb |
AK |
3 |
0 |
| Contract |
TO 5093-Recovery-FTQW042431-Repair HVAC System in Firehouse 2 (B4870) |
$656,866 |
Eielson Afb |
AK |
0 |
0 |
| Contract |
TO 5094-Recovery-FTQW071507-Replace Steam Traps in Amber Hall (B3112) |
$375,977 |
Eielson Afb |
AK |
0 |
0 |
| Contract |
TO 5083-Recovery-FTQW042407-Install Fire Suppression System Under Prime Beef Mezzanine |
$27,100 |
Eielson Afb |
AK |
0 |
0 |
| Contract |
TO 5084-Recovery-FTQW052517-Repair Fire Suppression (B4105/Snow Barn) |
$17,263 |
Eielson Afb |
AK |
1 |
0 |
| Contract |
TO 5092-Recovery-FRQW071038-Repair North Street / Wabash Avenue Intersection |
$627,945 |
Eielson Afb |
AK |
0 |
0 |
| Contract |
Repair approximately 700 feet of failing roadway. |
$65,157 |
Fort Drum |
NY |
2 |
0 |
| Contract |
Upgrade electric system, P-4400. |
$122,214 |
Fort Drum |
NY |
0 |
0 |
| Contract |
Emergency repairs to runway 15-33 |
$518,081 |
Fort Drum |
NY |
0 |
0 |
| Contract |
Repair 5,050 feet of Lewis Avenue Roadway |
$229,718 |
Fort Drum |
NY |
2 |
0 |
| Contract |
Replace existing at grade railroad crossing on Lewis Avenue. |
$101,001 |
Fort Drum |
NY |
2 |
0 |
| Contract |
Repair 'Restore Hope Roadway'. |
$67,015 |
Fort Drum |
NY |
2 |
0 |
| Contract |
Repair signal controllers and mastheads. |
$370,294 |
Fort Drum |
NY |
0 |
0 |
| Contract |
Repair Mt. Belvedere railroad crossing. |
$227,380 |
Fort Drum |
NY |
0 |
0 |
| Contract |
Repair water tank #3. |
$514,668 |
Fort Drum |
NY |
6 |
0 |
| Contract |
Repair building P-10670 motor pool roof and repair doors |
$3,154,385 |
Fort Drum |
NY |
2 |
0 |