Awards in Montana
Below are the stimulus contracts, grants, and loans in this state. You can click on an award to read (and add to) its description. You can also discuss the award and vote on whether you are satisfied with it or not. For a more local view, you can drill down to awards in a particular city.
The total of cost of all the projects submitted by Montana is $876,132,861.33
View demographic, economic, housing and other information about Montana on VeryLocalData.com
Click here to see a list of cities in Montana
| City |
Num. Awards |
Awards Total |
| Anaconda |
5 |
$1,771,490.00 |
| Ashland |
1 |
$293,820.00 |
| Baker |
1 |
$62,556.00 |
| Big Sky |
1 |
$372,340.00 |
| Billings |
28 |
$30,707,198.06 |
| Box Elder |
25 |
$38,564,452.00 |
| Bozeman |
43 |
$20,326,299.24 |
| Brockton |
2 |
$956,141.00 |
| Browning |
13 |
$6,485,810.00 |
| Butte |
11 |
$3,362,272.00 |
| Chinook |
3 |
$545,954.00 |
| Colstrip |
1 |
$113,535.00 |
| Columbia Falls |
4 |
$17,980,068.94 |
| Corvallis |
1 |
$467,500.00 |
| Crow Agency |
18 |
$9,264,241.00 |
| Cut Bank |
3 |
$511,051.00 |
| Darby |
1 |
$29,000.00 |
| Decker |
1 |
$700,000.00 |
| Deer Lodge |
1 |
$205,652.66 |
| Dillon |
3 |
$72,203.00 |
| Dixon |
1 |
$12,338.00 |
| Dupuyer |
2 |
$4,592.00 |
| Ennis |
1 |
$179,000.00 |
| Forsyth |
1 |
$13,574.00 |
| Fort Benton |
1 |
$67,821.00 |
| Fort Harrison |
1 |
$2,865,000.00 |
| Gardiner |
1 |
$34,500.00 |
| Glasgow |
1 |
$122,568.00 |
| Glendive |
2 |
$118,466.00 |
| Great Falls |
18 |
$34,606,661.37 |
| Hamilton |
6 |
$2,119,015.30 |
| Harlem |
14 |
$5,333,157.00 |
| Havre |
7 |
$9,014,125.25 |
| Heart Butte |
1 |
$42,173.00 |
| Helena |
129 |
$524,141,024.00 |
| Kalispell |
10 |
$2,225,596.00 |
| Lame Deer |
9 |
$5,550,414.00 |
| Lewistown |
6 |
$2,567,988.12 |
| Libby |
10 |
$1,406,936.00 |
| Lima |
3 |
$156,676.05 |
| Livingston |
6 |
$1,281,526.00 |
| Lolo |
1 |
$2,000,000.00 |
| Loma |
3 |
$1,667,000.00 |
| Loring |
1 |
$7,544,151.00 |
| Malmstrom A F B |
18 |
$9,149,827.95 |
| Malta |
4 |
$4,178,023.00 |
| Miles City |
4 |
$472,964.90 |
| Missoula |
71 |
$28,904,822.61 |
| Pablo |
8 |
$7,733,861.00 |
| Polson |
2 |
$176,724.00 |
| Poplar |
11 |
$59,471,049.00 |
| Pryor |
2 |
$32,992.00 |
| Red Lodge |
1 |
$497,351.00 |
| Ronan |
3 |
$1,017,678.00 |
| Saint Ignatius |
4 |
$474,000.00 |
| Scobey |
1 |
$6,595,988.13 |
| Sheridan |
2 |
$1,292,000.00 |
| Sidney |
2 |
$236,908.00 |
| Sula |
1 |
$1,123,435.50 |
| Superior |
1 |
$142,382.00 |
| Thompson Falls |
2 |
$336,898.65 |
| Trout Creek |
1 |
$21,192.60 |
| Twin Bridges |
2 |
$2,733,100.00 |
| Valier |
2 |
$1,977,500.00 |
| Victor |
1 |
$41,374.00 |
| West Yellowstone |
1 |
$187,542.00 |
| Whitefish |
3 |
$981,367.00 |
| Whitehall |
4 |
$3,900,000.00 |
| Whitetail |
1 |
$8,485,000.00 |
| Wolf Point |
1 |
$84,347.00 |
| Wyola |
1 |
$18,647.00 |
| Type |
Description |
Amount |
City |
State |
Jobs |
Vote |
| Contract |
Replacement of the existing dock systems at Smith, Brush and Sinclair Lakes with new commercially supplied low maintenance dock systems.… |
$93,440 |
Missoula |
MT |
2 |
-1 |
| Contract |
Replacement of the existing dock systems at Smith, Brush and Sinclair Lakes with new commercially supplied low maintenance dock systems.… |
$8,827 |
Missoula |
MT |
2 |
0 |
| Contract |
Recovery - FY09 Cascade West Fork Rock Creek Road #2071 Phases III & IV Road Reconstruction. Custer National Forest; Beartooth… |
$2,689,739 |
Bozeman |
MT |
12 |
0 |
| Contract |
Architectural Services - Other Architects & Engin Gen |
$29,099 |
Bozeman |
MT |
0 |
-1 |
| Contract |
DESCRIPTION: THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE $2,000,000 FOR THE CONTINUATION OF THE FUND-LEAD REMEDIAL ACTION (RA) ACTIVITIES… |
$2,000,000 |
Helena |
MT |
0 |
-2 |
| Contract |
repair vehicle ground points at launch facilities project number NZAS 00-2003A |
$151,413 |
Malmstrom A F B |
MT |
3 |
-1 |
| Contract |
Repair drainage and erosion at MAFs. |
$173,267 |
Malmstrom A F B |
MT |
4 |
-1 |
| Contract |
Billings, MT Federal Courthouse: ALTA/ACSM survey with boundary amendments; Amended Subdivision Plats; topographic survey; exhibit preparation |
$13,005 |
Billings |
MT |
0 |
0 |
| Contract |
Primary purpose is to provide Total Performance Warranty services. Project is provide roofing maintenance and minor repairs on appoximately 384,000… |
$248,270 |
Malmstrom A F B |
MT |
0 |
-1 |
| Contract |
Quarters Moderinization project IHS Browning MT |
$500,000 |
Browning |
MT |
0 |
0 |
| Contract |
Exterior Insulation Finish Systems |
$15,584 |
Browning |
MT |
0 |
0 |
| Contract |
Northern Cheyenne Health Center VSD Piping Modification BI09NC202C6 |
$74,258 |
Lame Deer |
MT |
0 |
0 |
| Contract |
Recovery Act/ARRA ABL80 Flex Analyzer with Co-ox |
$78,012 |
Hamilton |
MT |
2 |
0 |
| Contract |
The work consists of furnishing qualified personnel and necessary equipment and materials to provide construction staking, support and inspection services… |
$358,759 |
Missoula |
MT |
1 |
-1 |
| Contract |
Dam Conditions Assessment. Totally compete the provided Dam Condition Assessment Checklist. The non checklist portion (survey data and calculations) (page… |
$121,332 |
Billings |
MT |
0 |
0 |
| Contract |
Pompey Pillar Energy Improvement Project. A)Task 'A'. Prepare a conceptual design for the istallation of a boiler to be included… |
$6,427 |
Billings |
MT |
0 |
0 |
| Contract |
The overall goal of this SBIR Phase 1&2 effort is to develop optically pumped waveguide up-conversion modules for efficient single… |
$299,993 |
Bozeman |
MT |
1 |
0 |
| Contract |
Replace Elk Lake Road Kiosk |
$36,975 |
Lima |
MT |
1 |
-2 |
| Contract |
heat system lost trail wildlife refuge |
$28,610 |
Kalispell |
MT |
1 |
-1 |
| Contract |
to cover short falls in projcect based section 8 contracts |
$67,821 |
Fort Benton |
MT |
13 |
0 |