Below are the stimulus contracts, grants, and loans in this city. You can click on an award to read (and add to) its description. You can also discuss the award and vote on whether you are satisfied with it or not. For a more local view, you can drill down to awards in a particular city. Just choose a city from the following list.
The total of cost of all the projects submitted by Bellevue is $25,363,873.50
View demographic, economic, housing and other information about the 98004 Zip code on VeryLocalData.com
| Type |
Description |
Amount |
City |
State |
Jobs |
Vote |
| Contract |
Bandon Marsh National Wildlife Refuge Planning and Design of Powerline Crossing of Coquille River and Floodplain. Services will include Preliminary… |
$26,026 |
Bellevue |
WA |
0 |
-1 |
| Contract |
Provide engineering services for Miter Gate Plans and Specification for Chickamauga Lock |
$58,840 |
Bellevue |
WA |
2 |
0 |
| Contract |
Design of Demolition, Hazmat Remediation, and Environmental Restoration of Building B&C at the NOAA Southwest Fisherie4s Science Center in La… |
$192,925 |
Bellevue |
WA |
1 |
0 |
| Contract |
This is a project to build a scientific instrument to measure the Volume Scattering Function of seawater. |
$599,501 |
Bellevue |
WA |
0 |
-1 |
| Contract |
Initial deployment site assessment for accelerated ResSIM Modeling Assistance for Mobile District Manual Update Studies, dated July 2009. |
$43,648 |
Bellevue |
WA |
0 |
0 |
| Contract |
The purpose of this Task Order is for the Architect-Engineer to prepare a a final Design Documentation Report (DDR) for… |
$902,852 |
Bellevue |
WA |
0 |
-1 |
| Contract |
Dam Safety Analysis of Spillway Capacity under Conditions of Probable Maximum Flood - Lake Washington Ship Canal and Hiram M.… |
$184,930 |
Bellevue |
WA |
0 |
0 |
| Contract |
IDIQ for Multi-Disciplinary Contract Washington Shore Entrance Modifications Design Documentation Report Bonneville Dam, Columbia River |
$562,712 |
Bellevue |
WA |
5 |
0 |
| Contract |
Levee Inspection Workshop |
$47,811 |
Bellevue |
WA |
1 |
0 |
| Contract |
Requirements and Estimating Services for facilities in GSA Region 10 Prepare performance based requirements packages for solicitation of Design/Build contracts… |
$137,813 |
Bellevue |
WA |
2 |
0 |
| Contract |
Accelerated CWMS deployment for Apalachicola-Chattahoochee-Flint Basin, dated September 2009 |
$601,894 |
Bellevue |
WA |
0 |
0 |
| Contract |
Bonneville Navigation Lock control system replacement plans and specifications |
$197,505 |
Bellevue |
WA |
3 |
0 |
| Contract |
Revision to Howard Hanson Dam Water Control Manual |
$214,849 |
Bellevue |
WA |
0 |
0 |
| Contract |
Provide Value Engineering Analysis of project proposing to relocate a transmission line under Tidal Marsh Habitat Restoration Area, within the… |
$38,009 |
Bellevue |
WA |
1 |
0 |
| Grant |
Federal Work Study Program |
$31,436 |
Bellevue |
WA |
24 |
0 |
| Grant |
Sudden Cardiac Death in Heart Failure Trial 10 Year Follow-up (SCD-HeFT 10 yr.) |
$496,015 |
Bellevue |
WA |
2 |
0 |
| Grant |
Design and testing of CO2 compression using super sonic shock wave technology. |
$20,000,000 |
Bellevue |
WA |
24 |
-2 |
| Grant |
Eastwood Square Apartments |
$376,704 |
Bellevue |
WA |
2 |
0 |
| Grant |
Community Development |
$191,689 |
Bellevue |
WA |
0 |
0 |
| Grant |
Bellevue Manor Apartments |
$319,800 |
Bellevue |
WA |
0 |
0 |