| Contract |
#2145-REPAIR SIDEWALK,ADMIN |
$12,471 |
Hampton |
VA |
1 |
-1 |
| Contract |
REPLACE DISABLE ACCESS/WHEELCHAIR RAMP |
$10,102 |
Hampton |
VA |
2 |
1 |
| Contract |
#2147 JEFFERSON AVE |
$133,298 |
Hampton |
VA |
1 |
-2 |
| Contract |
INSTALL LEFT TURN LANSE & REPAVE LEE BLVD |
$417,386 |
Hampton |
VA |
1 |
-1 |
| Contract |
PAVING WASHINGTON BLVD |
$698,492 |
Hampton |
VA |
1 |
-1 |
| Contract |
RECOVERY-FELKER AIRFIELD |
$1,673,510 |
Hampton |
VA |
1 |
-3 |
| Contract |
Submersible Pressure Transducers |
$12,769 |
Hampton |
VA |
0 |
0 |
| Contract |
Submersible Pressure Transducers |
$58,523 |
Hampton |
VA |
0 |
0 |
| Contract |
Reconstruction of the Glasshouse Parking Lot/NOL Area, COLO-152684 |
$565,094 |
Hampton |
VA |
0 |
-3 |
| Contract |
Lincoln Park High Rise Flooring Replacement Project |
$212,055 |
Hampton |
VA |
7 |
-1 |
| Contract |
Delivery/Task Order |
$1,043,385 |
Hampton |
VA |
23 |
0 |
| Contract |
Abatement of lead paint, stripping of existing coating, repainting the interior and exterior of sliding hanging doors, replace windows, etc. |
$1,115,100 |
Hampton |
VA |
1 |
0 |
| Contract |
Floors, HVAC, Latrines at Bldg 374 Provide all labor, equipment and materials necessary to repair Floors, HVAC, Latrines in Building… |
$376,636 |
Hampton |
VA |
1 |
0 |
| Contract |
Special door seal installation |
$105,453 |
Hampton |
VA |
1 |
0 |
| Contract |
Conducting an independent technical review of the design architects design for the Langley Medical Treatment and Outpatient Building 74 at… |
$1,208,592 |
Hampton |
VA |
0 |
0 |
| Contract |
Destratification fans |
$21,238 |
Hampton |
VA |
1 |
0 |
| Contract |
Repair by Replace Inefficient Lighting This is a design-build project to reduce energy consumption and increase efficiency by installing day-lighting… |
$1,038,589 |
Hampton |
VA |
0 |
0 |
| Contract |
Repair Airfiled Ramp W Apron The work under this design-build projects consists of the demolition and replacement of existing high… |
$1,544,807 |
Hampton |
VA |
0 |
0 |
| Contract |
Repair by Replacement of WSHP motors: Contractor shall include all labor and materials in order to repair by replacement of… |
$311,305 |
Hampton |
VA |
0 |
0 |
| Contract |
Provide all labor, materials, tools, equipment, transportation, and qualified supervision to complete project titled Recovery Act Nurse Call. Work shall… |
$655,000 |
Hampton |
VA |
0 |
0 |