| Contract |
Receive 15,724 Cubic Yards of Bulk Soil for Disposal. |
$1,872,414 |
Salt Lake City |
UT |
0 |
1 |
| Contract |
Provide non-personal, professional engineering support servicses for FHWA's Utah Division for oversight of 20 ARRA projects in Utah. |
$85,288 |
Salt Lake City |
UT |
1 |
0 |
| Contract |
Type C Construction inspection services for the Fire Station Complex, Phase 2, Mobility Processing/EOD Training a the Utah Air National… |
$120,183 |
Salt Lake City |
UT |
0 |
0 |
| Contract |
Review Environmental Report for Boulder Water Project in accordance with RUS Bulletin 1794A-602 included with the projects. |
$2,100 |
Salt Lake City |
UT |
1 |
0 |
| Contract |
Architectural & engineering services to provide design replacement HVAC systems with Ground Source Heat Pumps. |
$210,968 |
Salt Lake City |
UT |
4 |
1 |
| Contract |
Review PER for the Drinking water porject for town in accordance with the Rural Development Bulletin 1780-2 and Utah supplement… |
$1,950 |
Salt Lake City |
UT |
1 |
0 |
| Contract |
Rehabilitate the Moose Maintenance Buildin, Design-Build Services |
$31,731 |
Salt Lake City |
UT |
7 |
0 |
| Contract |
Walker lake Bosker |
$278,200 |
Salt Lake City |
UT |
0 |
0 |
| Contract |
The project includes the construction of curb, gutter and sidewalk along both sides of Lester Street (1585 West) from Russett… |
$250,336 |
Salt Lake City |
UT |
21 |
0 |
| Contract |
Architectural & design services for the replacement of HVAC for the Logan Greenhouse. |
$7,231 |
Salt Lake City |
UT |
0 |
0 |
| Contract |
Review PER for the Drinking water project for Washington County Conservation DIstrict in accordance with RD Bulletin 1780-2 and Utah… |
$1,950 |
Salt Lake City |
UT |
1 |
0 |
| Contract |
Architectural & engineering services to construct a heated weather canopy, at the East Gate of Hill Air Force Base, building… |
$46,484 |
Salt Lake City |
UT |
17 |
0 |
| Contract |
Review Environmental Report for the Drinking water project for Washington County Conservation DIstrict in accordance with RUS Bulletin 1794A-602 included… |
$2,100 |
Salt Lake City |
UT |
1 |
0 |
| Contract |
To provide the following merchandise for BLM project: 2146 each Galvanized Steel Posts; 2146 each Galvanized Steel Post Anchors; 2146… |
$44,682 |
Salt Lake City |
UT |
0 |
0 |
| Contract |
Type C Construction inspection services for the Fire Station Complex, Phase 2, Mobility Processing/EOD Training a the Utah Air National… |
$120,183 |
Salt Lake City |
UT |
0 |
0 |
| Contract |
Review PER for Boulder Water Project in accordance with RD Bulletin 1780-2 and the Utah Supplement included with the projects. |
$1,950 |
Salt Lake City |
UT |
1 |
0 |
| Contract |
Composite Fire Station, Mobility Processing, and EOD Facility at the Utah Air National Guard at Salt Lake City Utah. |
$2,166,982 |
Salt Lake City |
UT |
0 |
0 |
| Contract |
Student/Resident Experiences and Rotations in Community Health (SEARCH) |
$186,371 |
Salt Lake City |
UT |
1 |
-1 |
| Contract |
GSBS Architects was awarded a recommissioning study under the American Recovery and Reinvestment Act for the Wallace F. Bennett Building… |
$125,579 |
Salt Lake City |
UT |
1 |
0 |
| Contract |
Architectural & engineering services for the Museum Collection Facility ar Hopewell Culture National Historic Park. |
$175,803 |
Salt Lake City |
UT |
17 |
0 |