| Contract |
Scope of work including providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a… |
$10,883,015 |
Mcallen |
TX |
36 |
-3 |
| Contract |
Bidding services and construction management services for the Banker Floodway North Levee Project; units of measure are estimated for 6… |
$176,327 |
Mcallen |
TX |
0 |
0 |
| Contract |
Scope of work including providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a… |
$1,403,915 |
Mcallen |
TX |
0 |
0 |
| Contract |
Firm Fixed Price with adjustable amount via 15% difference in quantities - To provide all plant, labor and equipment for… |
$950,997 |
Mcallen |
TX |
3 |
-1 |
| Contract |
Scope of work including providing personnel and equipment necessary to perform geotechnical investigations and engineering evaluations (sealed by a licensed… |
$612,066 |
Mcallen |
TX |
0 |
0 |
| Contract |
The scope of work included providing personnel and equipment necessary to perform geotechnical investigations and engineering evaluations (sealed by a… |
$711,059 |
Mcallen |
TX |
0 |
0 |
| Contract |
Scope of work is for the aerial and design survey for the design of rehabiliatation improvements for the Upper Rio… |
$2,285,848 |
Mcallen |
TX |
23 |
-1 |
| Contract |
Main Floodway From 23rd Street to FM 1015 A Lower Rio Grande Flood Control Project (LRGFCP) located in Hidalgo County.… |
$19,169,160 |
Mcallen |
TX |
3 |
0 |
| Contract |
The proposed work is for the re-design of the Lower Rio Grande Flood Control Project - Hidalgo Protective Levee -… |
$53,075 |
Mcallen |
TX |
0 |
0 |
| Contract |
Aerial Survey for Design of Rehabilitation Improvements for the Lateral A to Donna Pump to Retamal Dam Levee Reach Within… |
$145,646 |
Mcallen |
TX |
0 |
0 |
| Contract |
The proposed work is for the re-design of the Lower Rio Grande Flood Control Project - Hidalgo Protective Levee -… |
$33,158 |
Mcallen |
TX |
0 |
0 |
| Contract |
Scope of work including providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a… |
$79,635 |
Mcallen |
TX |
0 |
0 |
| Contract |
Scope of work including providing personnel and equipment necessary to perform engineering; final design; and preparation of construction documents for… |
$836,646 |
Mcallen |
TX |
0 |
0 |
| Grant |
Fiscal Year 2009 Recovery Act JAG Program |
$191,317 |
Mcallen |
TX |
0 |
0 |
| Grant |
CS Fr. ON MI 2 N FROM SH 107 (CONWAY AVE.) To. TAYLOR ROAD; RECONSTRUCTION AND WIDENING OF MILE 2 NORTH ROAD |
$6,452,452 |
Mcallen |
TX |
0 |
0 |
| Grant |
Rehabilitate Runway |
$5,400,000 |
Mcallen |
TX |
0 |
-1 |
| Grant |
ARRA Capital Fund Program |
$384,653 |
Mcallen |
TX |
1 |
0 |
| Grant |
Purchase of seven expansion buses. |
$2,374,158 |
Mcallen |
TX |
0 |
0 |
| Grant |
Federal Work-Study |
$130,982 |
Mcallen |
TX |
9 |
-1 |
| Grant |
S. 26th Street Storm Sewer Improvement Project |
$479,685 |
Mcallen |
TX |
0 |
0 |