| Contract |
Comprehensive Energy & Water Evaluation Study - U.S. Fish and Wildlife Service, Region Eight. This study includes evaluations for multiple… |
$182,916 |
Portland |
OR |
0 |
0 |
| Contract |
RECOVERY-NEPA FOR ARRA PROJECTS AT MALHEUR NATIONAL WILDLIFE REFUGE |
$94,747 |
Portland |
OR |
0 |
1 |
| Contract |
Nehalem River Flood Modeling for the City of Veronia, OR |
$79,990 |
Portland |
OR |
0 |
-2 |
| Contract |
Prepare Hydraulic Steel Structires analysis reports for the following gates: Blue River, Cougar, Fern Ridge, Detroit, Fall Creek, Lookout Point.… |
$1,073,986 |
Portland |
OR |
0 |
0 |
| Contract |
Design, fabricate and Install exhibits for4 the Gavins Point Dam Power Plant lobby and the Garrison Dam Power Plant lobby |
$314,880 |
Portland |
OR |
0 |
-2 |
| Contract |
198 SATELLITE ANTENNAS AND MOUNTS FOR GOES. |
$69,427 |
Portland |
OR |
0 |
-3 |
| Contract |
Modernize, refurbish, and upgrade the Navy side of the Administrative building, Navy Operational Center (NOSC) at Portland, Oregon. Remove, dispose… |
$4,474,265 |
Portland |
OR |
0 |
-2 |
| Contract |
Providing a qualified engineering geologist, knowledgable in slurry wall installation, to witness installation of a Cement Bentonite slurry wall in… |
$38,770 |
Portland |
OR |
0 |
0 |
| Contract |
Ecosystem Restoration General Investigation Feasibility Study/Draft PEIS Lower Willamette River |
$573,375 |
Portland |
OR |
5 |
0 |
| Contract |
Design Fabricate and Install Multiple Interpretive Panels and Mounting Structures for the USACE |
$37,761 |
Portland |
OR |
0 |
0 |
| Contract |
To improve road surface at VA National Cemetery. |
$91,755 |
Portland |
OR |
0 |
0 |
| Contract |
The purpose of this Task Order is for the Architect-Engineer to provide engineering services for Sandblast/Paint Facility construction proposal, First… |
$577,956 |
Portland |
OR |
0 |
0 |
| Contract |
Design Fabricate and Install Visitor Center Interpretive Exhibits |
$720,000 |
Portland |
OR |
0 |
0 |
| Contract |
Perform levee safety Periodic Inspections (PI) on the levee systems. The purpose of the PI is to verify proper operation… |
$44,753 |
Portland |
OR |
1 |
1 |
| Contract |
Design Fabricate and Install Multiple Interpretive Panels and Mounting Structures for the USACE |
$218,970 |
Portland |
OR |
0 |
1 |
| Contract |
Scoping Visit to Quilcene Fish Hatchery |
$5,000 |
Portland |
OR |
0 |
-5 |
| Contract |
Architectural Services - Electric Power Generation (EPG) |
$199,832 |
Portland |
OR |
0 |
-4 |
| Contract |
A/E services to design the repair of an earthen settling basin at Abernathy Fish Technology Center, Longview WA |
$36,880 |
Portland |
OR |
0 |
-2 |
| Contract |
GOES SATELLITE ANTENNAS AND MOUNTS. |
$3,506 |
Portland |
OR |
0 |
0 |