| Contract |
The work includes demolition, minor asbestos abatement, minor architectural repairs, new steel storage sheds, roofing, HVAC renovation and new construction,… |
$2,320,737 |
Cincinnati |
OH |
30 |
1 |
| Contract |
Inspection of two artworks at the federal building for condition and threat from planned building renovation. The project results in… |
$5,232 |
Cincinnati |
OH |
0 |
1 |
| Contract |
For funding a Technical Instruction to perform assessment of technologies to support DDG51 hybrid Drive development effort |
$500,000 |
Cincinnati |
OH |
0 |
-1 |
| Contract |
Turbine guide bearing repairs to Units 3 and 4 at Carters Powerhouse, Chatsworth, GA |
$38,980 |
Cincinnati |
OH |
1 |
0 |
| Contract |
WORK ORDER UNDER THE AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA) FOR RECOMISSIONING AT THE POTTER STEWART US COURTHOUSE IN CINCINNATI,… |
$87,124 |
Cincinnati |
OH |
0 |
0 |
| Contract |
Turbine guide bearing repairs to Units 3 and 4 at Carters Powerhouse, Chatsworth, GA |
$38,980 |
Cincinnati |
OH |
1 |
0 |
| Contract |
Qty 17 HP scanners with 3 year warranty and multiple shipping locations |
$22,644 |
Cincinnati |
OH |
4 |
-3 |
| Contract |
RECOVERY - AMPI: In-Line Tow Coating for Silicon Carbide (SiC) Fibers Ceramic Matrix Composites (CMCs) will replace metal coated components… |
$1,520,000 |
Cincinnati |
OH |
1 |
1 |
| Contract |
masonry restoration of building #1 and #15 exterior façade |
$1,053,209 |
Cincinnati |
OH |
6 |
2 |
| Contract |
RECOVERY - AMPI: 3D Inspection System Phase II Develop and demonstrate technologies that will enable the airfoil manufacturing process to… |
$1,520,000 |
Cincinnati |
OH |
1 |
2 |
| Contract |
This report is composed of two modifications. The first modification incorporates additional design phase services for the first floor window… |
$228,854 |
Cincinnati |
OH |
3 |
0 |
| Contract |
HP computer equipment including 1 tablet, 9 desktops, 4 color laser printers, 9 all-in-one printers, 4 22' Hyundai monitors, 25… |
$57,215 |
Cincinnati |
OH |
4 |
-1 |
| Grant |
WALNUT HILLS APTS. |
$512,988 |
Cincinnati |
OH |
0 |
0 |
| Grant |
Cincinnati Neuro-Oncology Research Core |
$706,666 |
Cincinnati |
OH |
0 |
0 |
| Grant |
Role of IL-15 in the Pathogensis of Eosinophilic Esophagitis |
$371,814 |
Cincinnati |
OH |
3 |
0 |
| Grant |
An Animal Model of Hemophagocytic Lymphohistiocytosis |
$249,023 |
Cincinnati |
OH |
0 |
0 |
| Grant |
Direct IL-4 and IL-13 effects on pulmonary smooth muscle in allergic airway disease |
$468,750 |
Cincinnati |
OH |
0 |
0 |
| Grant |
Mechanism of Vasopressin-Mediated Placental Vascular Resistance after Fetal Bypass. |
$182,794 |
Cincinnati |
OH |
1 |
0 |
| Grant |
Therapy of Gaucher Disease: In Vivo Enhancement of Residual Mutant Activity |
$190,325 |
Cincinnati |
OH |
1 |
0 |
| Grant |
Homeless Prevention and Rapid Re-Housing Program (HPRP) |
$5,339,182 |
Cincinnati |
OH |
2 |
0 |