| Contract |
This is a modification to an existing construction contract no. 08CC603730, awarded 9/9/2009, full and open competition. This modification provides… |
$324,383 |
Columbus |
OH |
6 |
0 |
| Contract |
Perform a levee safety Periodic Inspection (PI) on the West Columbus, Chillicothe, Roseville, Massillon, and Newark levee systems. The levee… |
$699,574 |
Columbus |
OH |
1 |
0 |
| Contract |
Phase III Construction for the MALSR at Ohio State University, columbus, OH, on runway 09R |
$701,582 |
Columbus |
OH |
5 |
0 |
| Contract |
Digital Television (DTV) Basic In?Home Assistance - 326 installations of digital television receivers/converter boxes to allow individuals without digital televisions… |
$55,000 |
Columbus |
OH |
3 |
-5 |
| Contract |
The first portion of the project was to assess the building with the aid of a previous recommissioning study and… |
$116,113 |
Columbus |
OH |
2 |
0 |
| Contract |
The first portion of the project was to assess the building with the aid of a previous recommissioning study and… |
$68,558 |
Columbus |
OH |
1 |
0 |
| Contract |
The first portion of the project was to study the Kinneary Federal Courthouse in Columbus, OH for potential Energy Conservation… |
$385,189 |
Columbus |
OH |
2 |
0 |
| Contract |
The main goal of the Ohio SEARCH Program is to improve access to care for underserved populations by developing culturally… |
$182,181 |
Columbus |
OH |
0 |
-1 |
| Contract |
(ARRA) Early therapeutics development with a phase II emphasis. The objectives of these contracts are to conduct Phase 2 and… |
$754,737 |
Columbus |
OH |
0 |
-1 |
| Contract |
This project uses the smart-cut methods to produce high performance and advanced functionality lithium tantalate pyroelectric sensors. The thin film… |
$299,999 |
Columbus |
OH |
7 |
0 |
| Contract |
Review as-built information and collect supplemental data to meet the certification requirements outlined in 44 CFR 65.10 and detailed in… |
$294,811 |
Columbus |
OH |
1 |
0 |
| Contract |
Contractor is tasked to support the Loan Guarantee Program Office of the Department of Energy in its management of the… |
$4,330,228 |
Columbus |
OH |
3 |
-1 |
| Contract |
Review as-built information and collect supplemental data to meet the certification requirements outlined in 44 CFR 65.10 and detailed in… |
$283,917 |
Columbus |
OH |
2 |
0 |
| Contract |
From Contract, Section C, Item 1. (General/Purpose): 'The Contractor shall perform all necessary survey work as described below in the… |
$13,918 |
Columbus |
OH |
3 |
-2 |
| Contract |
Replace Water Lines for OANG Building 24 |
$155,388 |
Columbus |
OH |
0 |
0 |
| Contract |
Intensive (Locational) Archeological Surveys of Charles River Storage Areas, MA; East Brimfield Lake, MA; West Hill Dam, MA; Westville Lake… |
$1,919,595 |
Columbus |
OH |
52 |
1 |
| Contract |
Utilize econometric and statistical techniques to estimate the number of indirect and inducted jobs created as a result of ARRA… |
$150,000 |
Columbus |
OH |
0 |
-2 |
| Contract |
Part one includes the miter gate three-dimensional Finite Element analysis and design of all structural features required to transport, rotate… |
$292,596 |
Columbus |
OH |
1 |
0 |
| Grant |
ARRA-Nurse Faculty Loan Program |
$21,108 |
Columbus |
OH |
0 |
-1 |
| Grant |
ARRA State Clean Diesel - Ohio Environmental Protection Agency |
$1,730,000 |
Columbus |
OH |
0 |
0 |