| Contract |
Requisition to DJ&A to include site visit, survey and design of the Quartz-Cottonwood Road system involving portions of Roads 416,… |
$182,882 |
Missoula |
MT |
2 |
-3 |
| Contract |
Upgrade and expand capacity of launch control facility electrical |
$518,723 |
Missoula |
MT |
0 |
0 |
| Contract |
Fedar Creek Bridge Replacement |
$18,253 |
Missoula |
MT |
2 |
0 |
| Contract |
Kalispell Boat Launch Facility |
$4,007 |
Missoula |
MT |
2 |
0 |
| Contract |
The work consists of furnishing qualified personnel and necessary equipment and materials to provide construction staking, support and inspection services… |
$100,551 |
Missoula |
MT |
1 |
0 |
| Contract |
Replacement of the existing dock systems at Smith, Brush and Sinclair Lakes with new commercially supplied low maintenance dock systems.… |
$93,440 |
Missoula |
MT |
2 |
-1 |
| Contract |
Replacement of the existing dock systems at Smith, Brush and Sinclair Lakes with new commercially supplied low maintenance dock systems.… |
$8,827 |
Missoula |
MT |
2 |
0 |
| Contract |
The work consists of furnishing qualified personnel and necessary equipment and materials to provide construction staking, support and inspection services… |
$358,759 |
Missoula |
MT |
1 |
-1 |
| Contract |
Requisition to DJ&A to include site visit, survey, parking capacity study, preliminary design, design alternatives, final design, supplemental specifications, drawings… |
$22,005 |
Missoula |
MT |
2 |
0 |
| Contract |
The work consists of furnishing qualified personnel and necessary equipment and materials to provide construction stkaing, support and inspection services… |
$45,133 |
Missoula |
MT |
1 |
0 |
| Contract |
A site visit was completed to discuss design alternatives, take field measurements and verify dimensions fo final design. During the… |
$4,732 |
Missoula |
MT |
2 |
0 |
| Contract |
The proposed bridge replacements consist of total replacements of the existing deficient bridges consistent with AASHTO and WFLHD design and… |
$222,926 |
Missoula |
MT |
2 |
0 |
| Grant |
Collaborative Research: Radial Growth Responses among Naturally-Occurring Western U.S. Conifers under Changing Environmental Conditions |
$182,953 |
Missoula |
MT |
1 |
0 |
| Grant |
Measures of Complexity in Brauer Groups |
$101,166 |
Missoula |
MT |
0 |
0 |
| Grant |
Ontogeny of Avian Locomotion: Aerodynamics, Skeletal Kinematics, and Neuromuscular Control. |
$317,878 |
Missoula |
MT |
0 |
0 |
| Grant |
COLLABORATIVE PROPOSAL: Evolutionary Genetics of Pollen Competition in Yellow Monkeyflowers. |
$338,364 |
Missoula |
MT |
0 |
-5 |
| Grant |
Sediment routing in gravel-bed rivers following dam removal. |
$179,703 |
Missoula |
MT |
1 |
0 |
| Grant |
CAREER: Leaf microclimates and plant-insect interactions. |
$837,367 |
Missoula |
MT |
2 |
0 |
| Grant |
Head Start |
$178,103 |
Missoula |
MT |
1 |
0 |
| Grant |
Theroetical investigation of molecule-intense laser interactions using quantum chemical approaches. |
$180,000 |
Missoula |
MT |
0 |
0 |