| Contract |
The work consists of furnishing qualified personnel and necessary equipment and materials to provide construction staking, support and inspection services… |
$100,551 |
Missoula |
MT |
1 |
0 |
| Contract |
The work consists of furnishing qualified personnel and necessary equipment and materials to provide construction staking, support and inspection services… |
$358,759 |
Missoula |
MT |
1 |
-1 |
| Contract |
The work consists of furnishing qualified personnel and necessary equipment and materials to provide construction stkaing, support and inspection services… |
$45,133 |
Missoula |
MT |
1 |
0 |
| Grant |
Sediment routing in gravel-bed rivers following dam removal. |
$179,703 |
Missoula |
MT |
1 |
0 |
| Grant |
Conformational Properties of Protein Denatured States. |
$142,901 |
Missoula |
MT |
1 |
0 |
| Grant |
Collaborative Research: Greenland Ice Sheet Basal Hydrology and Sliding Dynamics ? The Proof of the Drill. |
$474,340 |
Missoula |
MT |
1 |
0 |
| Grant |
Geologic and Paleomagnetic Study of the Basal Belt Supergroup, Little Belt Mountains, Montana: Testing the Siberian Connection to Rodinia. |
$55,466 |
Missoula |
MT |
1 |
0 |
| Grant |
Center for Structural and Functional Neuroscience |
$472,208 |
Missoula |
MT |
1 |
0 |
| Grant |
Regulation of Gene Expression in Borrelia burgdorferi |
$60,392 |
Missoula |
MT |
1 |
0 |
| Grant |
Lake County Fuels Reduction & Ecosystem Restoration |
$987,000 |
Missoula |
MT |
1 |
-4 |
| Grant |
CAREER: Leaf microclimates and plant-insect interactions. |
$837,367 |
Missoula |
MT |
2 |
0 |
| Contract |
Requisition to DJ&A to include site visit, survey and design of the Quartz-Cottonwood Road system involving portions of Roads 416,… |
$182,882 |
Missoula |
MT |
2 |
-3 |
| Contract |
Fedar Creek Bridge Replacement |
$18,253 |
Missoula |
MT |
2 |
0 |
| Contract |
Kalispell Boat Launch Facility |
$4,007 |
Missoula |
MT |
2 |
0 |
| Contract |
Replacement of the existing dock systems at Smith, Brush and Sinclair Lakes with new commercially supplied low maintenance dock systems.… |
$93,440 |
Missoula |
MT |
2 |
-1 |
| Contract |
Replacement of the existing dock systems at Smith, Brush and Sinclair Lakes with new commercially supplied low maintenance dock systems.… |
$8,827 |
Missoula |
MT |
2 |
0 |
| Contract |
Requisition to DJ&A to include site visit, survey, parking capacity study, preliminary design, design alternatives, final design, supplemental specifications, drawings… |
$22,005 |
Missoula |
MT |
2 |
0 |
| Contract |
A site visit was completed to discuss design alternatives, take field measurements and verify dimensions fo final design. During the… |
$4,732 |
Missoula |
MT |
2 |
0 |
| Contract |
The proposed bridge replacements consist of total replacements of the existing deficient bridges consistent with AASHTO and WFLHD design and… |
$222,926 |
Missoula |
MT |
2 |
0 |
| Grant |
Characterization and Use of Fluorescent Endocannabiniod Transporter Substrates. |
$18,180 |
Missoula |
MT |
2 |
0 |