| Contract |
Task Order 1 under this IDIQ contract is to complete Periodic Inspections (PI) of 4 levee systems along the Mississippi… |
$508,151 |
Saint Louis |
MO |
1 |
0 |
| Contract |
Demo existing boiler controls and design/procure/install new upgraded boiler controls that are capable of remote operation. |
$1,488,960 |
Saint Louis |
MO |
0 |
0 |
| Contract |
Lincoln shields handrail replacement |
$107,225 |
Saint Louis |
MO |
0 |
-1 |
| Contract |
This project will include installing a new HVAC and humidification system to meet the NARA 2009 requirements for file storage.… |
$5,184,000 |
Saint Louis |
MO |
0 |
-2 |
| Contract |
Provide civil engineering and surveying design services for a project to repair and/or replace the following items located on the… |
$48,000 |
Saint Louis |
MO |
0 |
-1 |
| Contract |
Miscellaneous Construction materials - EXTENSION CORDS AND FLANGE WEDGE IN DIFFERENT SIZES FOR THE MELVIN PRICE LOCK AND DAM GATE… |
$2,974 |
Saint Louis |
MO |
0 |
0 |
| Contract |
None at this time. |
$3,148,600 |
Saint Louis |
MO |
0 |
-1 |
| Contract |
Robert A. Young Federal Building, Neal Smith Federal Building, Sioux City Courthouse: conduct onsite Retro-Commissioning, Energy Audits, Energy Analysis Calculations,… |
$328,345 |
Saint Louis |
MO |
1 |
0 |
| Contract |
A/E Services under ARRA for replacement of existing sewer system for Federal Center Complex, including separation of storm and sanitary… |
$26,588 |
Saint Louis |
MO |
1 |
-1 |
| Contract |
Construction Management (Agency) Services for Construction of new federal Courthouse in Billings, Montana. Project will provide Construction Management (CM) Services… |
$64,460 |
Saint Louis |
MO |
0 |
-2 |
| Contract |
Construction Management Services for the Envelope Improvements at the Robert A Young Federal building.CM services includes the Preconstruction Phase toAttend… |
$25,703 |
Saint Louis |
MO |
0 |
-1 |
| Contract |
Basic in-home digital converter box, antenna, and scanning assistance to those who have not been able to successfully complete the… |
$723,500 |
Saint Louis |
MO |
11 |
-10 |
| Contract |
Correct Secondary power deficiencies at VA Medical Center - Jefferson Barracks. Replacement of obsolete back up power equipment in several… |
$887,700 |
Saint Louis |
MO |
0 |
2 |
| Contract |
two new 750 CFM diesel engine rotary screw air compressors |
$102,190 |
Saint Louis |
MO |
0 |
-1 |
| Contract |
A/E Services under ARRA Federal Center Building 104 VA include: new advanced metering; 1st floor re-commissioning/retro-commissioning, new high efficiency chillers… |
$26,261 |
Saint Louis |
MO |
0 |
-1 |
| Contract |
Construct three dormitories at the St. Louis Job Corps Center |
$10,425,000 |
Saint Louis |
MO |
0 |
-3 |
| Contract |
The Robert A. Young Building is a high rise historic brick strucutre approximately 1 million square foot in size, housing… |
$1,909,000 |
Saint Louis |
MO |
0 |
0 |
| Contract |
Construction Management Services for the High Performance Green Building at the Thomas Eagleton Federal Courthouse.CM Services include attending Design Review… |
$24,953 |
Saint Louis |
MO |
0 |
0 |
| Contract |
Relocate/Upgrade B-50 Generator and Electrical for the Marion, Illinois, VA Medical Center in Marion, IL. |
$97,774 |
Saint Louis |
MO |
5 |
-1 |
| Contract |
Boat serice through mastership agreement to move fleet and Schreve barge for gate modification at Service base and Mel Price… |
$25,151 |
Saint Louis |
MO |
0 |
0 |