Below are the stimulus contracts, grants, and loans in this city. You can click on an award to read (and add to) its description. You can also discuss the award and vote on whether you are satisfied with it or not. For a more local view, you can drill down to awards in a particular city. Just choose a city from the following list.

The total of cost of all the projects submitted by Saint Louis is $323,377,517.74

Type Description Amount City State Jobs Vote
Contract Construction Management (Agency) Services for Construction of new federal Courthouse in Billings, Montana. Project will provide Construction Management (CM) Services… $64,460 Saint Louis MO 0 -2
Contract McClellan-Kerr Arkansas River Navigation System Lifting Beam and 50' and 60' stoplogs, AR. Work is scheduled to begain in October… $5,907,842 Saint Louis MO 0 -1
Contract Correct Secondary power deficiencies at VA Medical Center - Jefferson Barracks. Replacement of obsolete back up power equipment in several… $887,700 Saint Louis MO 0 2
Contract Task order is for archtectural-engineering services to prepare a design-build Request for Proposal (RFP) package for the repair and renovation… $239,824 Saint Louis MO 0 0
Contract two new 750 CFM diesel engine rotary screw air compressors $102,190 Saint Louis MO 0 -1
Contract Design services for revised design development through construction documents; LEED (Sustainability) coordination, monitoring, and submittal. Rehabilitation Mammoth Cave Visitor Center… $630,007 Saint Louis MO 0 0
Contract Construct three dormitories at the St. Louis Job Corps Center $10,425,000 Saint Louis MO 0 -3
Contract When the Federal Center was built in 1942 it was common practice to combine the sewer and storm water runoff… $8,317,000 Saint Louis MO 0 -1
Contract The Robert A. Young Building is a high rise historic brick strucutre approximately 1 million square foot in size, housing… $1,909,000 Saint Louis MO 0 0
Contract Kaskia River ortho photos $30,575 Saint Louis MO 0 -2
Contract Demo existing boiler controls and design/procure/install new upgraded boiler controls that are capable of remote operation. $1,488,960 Saint Louis MO 0 0
Contract Lincoln shields handrail replacement $107,225 Saint Louis MO 0 -1
Contract This project will include installing a new HVAC and humidification system to meet the NARA 2009 requirements for file storage.… $5,184,000 Saint Louis MO 0 -2
Contract Yuma Area Office Seismic Rehabilitation $145,250 Saint Louis MO 0 -1
Contract The following is a general description from the contract award. More detailed information will be available after we receive task… $1,000,000 Saint Louis MO 0 -1
Contract Miscellaneous Construction materials - EXTENSION CORDS AND FLANGE WEDGE IN DIFFERENT SIZES FOR THE MELVIN PRICE LOCK AND DAM GATE… $2,974 Saint Louis MO 0 0
Contract None at this time. $3,148,600 Saint Louis MO 0 -1
Contract The Robert A. Young (RAY) Federal Bulding (1,004,784 rsf, 1,131,935 gsf) stands at 21 stories tall and provides functional office… $7,008,200 Saint Louis MO 0 -1
Grant FY2009 ARRA COLA/Quality $769,013 Saint Louis MO 0 0
Grant Arts and the American Recovery & Reinvestment Act of 2009 $50,000 Saint Louis MO 0 -1