Below are the stimulus contracts, grants, and loans in this city. You can click on an award to read (and add to) its description. You can also discuss the award and vote on whether you are satisfied with it or not. For a more local view, you can drill down to awards in a particular city. Just choose a city from the following list.
The total of cost of all the projects submitted by Saint Louis is $323,377,517.74
View demographic, economic, housing and other information about the 63110 Zip code on VeryLocalData.com
| Type |
Description |
Amount |
City |
State |
Jobs |
Vote |
| Contract |
Construction Management (Agency) Services for Construction of new federal Courthouse in Billings, Montana. Project will provide Construction Management (CM) Services… |
$64,460 |
Saint Louis |
MO |
0 |
-2 |
| Contract |
McClellan-Kerr Arkansas River Navigation System Lifting Beam and 50' and 60' stoplogs, AR. Work is scheduled to begain in October… |
$5,907,842 |
Saint Louis |
MO |
0 |
-1 |
| Contract |
Correct Secondary power deficiencies at VA Medical Center - Jefferson Barracks. Replacement of obsolete back up power equipment in several… |
$887,700 |
Saint Louis |
MO |
0 |
2 |
| Contract |
Task order is for archtectural-engineering services to prepare a design-build Request for Proposal (RFP) package for the repair and renovation… |
$239,824 |
Saint Louis |
MO |
0 |
0 |
| Contract |
two new 750 CFM diesel engine rotary screw air compressors |
$102,190 |
Saint Louis |
MO |
0 |
-1 |
| Contract |
Design services for revised design development through construction documents; LEED (Sustainability) coordination, monitoring, and submittal. Rehabilitation Mammoth Cave Visitor Center… |
$630,007 |
Saint Louis |
MO |
0 |
0 |
| Contract |
Construct three dormitories at the St. Louis Job Corps Center |
$10,425,000 |
Saint Louis |
MO |
0 |
-3 |
| Contract |
When the Federal Center was built in 1942 it was common practice to combine the sewer and storm water runoff… |
$8,317,000 |
Saint Louis |
MO |
0 |
-1 |
| Contract |
The Robert A. Young Building is a high rise historic brick strucutre approximately 1 million square foot in size, housing… |
$1,909,000 |
Saint Louis |
MO |
0 |
0 |
| Contract |
Kaskia River ortho photos |
$30,575 |
Saint Louis |
MO |
0 |
-2 |
| Contract |
Demo existing boiler controls and design/procure/install new upgraded boiler controls that are capable of remote operation. |
$1,488,960 |
Saint Louis |
MO |
0 |
0 |
| Contract |
Lincoln shields handrail replacement |
$107,225 |
Saint Louis |
MO |
0 |
-1 |
| Contract |
This project will include installing a new HVAC and humidification system to meet the NARA 2009 requirements for file storage.… |
$5,184,000 |
Saint Louis |
MO |
0 |
-2 |
| Contract |
Yuma Area Office Seismic Rehabilitation |
$145,250 |
Saint Louis |
MO |
0 |
-1 |
| Contract |
The following is a general description from the contract award. More detailed information will be available after we receive task… |
$1,000,000 |
Saint Louis |
MO |
0 |
-1 |
| Contract |
Miscellaneous Construction materials - EXTENSION CORDS AND FLANGE WEDGE IN DIFFERENT SIZES FOR THE MELVIN PRICE LOCK AND DAM GATE… |
$2,974 |
Saint Louis |
MO |
0 |
0 |
| Contract |
None at this time. |
$3,148,600 |
Saint Louis |
MO |
0 |
-1 |
| Contract |
The Robert A. Young (RAY) Federal Bulding (1,004,784 rsf, 1,131,935 gsf) stands at 21 stories tall and provides functional office… |
$7,008,200 |
Saint Louis |
MO |
0 |
-1 |
| Grant |
FY2009 ARRA COLA/Quality |
$769,013 |
Saint Louis |
MO |
0 |
0 |
| Grant |
Arts and the American Recovery & Reinvestment Act of 2009 |
$50,000 |
Saint Louis |
MO |
0 |
-1 |