| Contract |
Provide Pre-Design and Design Review Servicesfor the building system modifications to meet NARA 2009 requirements for the VA file storage… |
$43,039 |
Saint Louis |
MO |
0 |
0 |
| Contract |
When the Federal Center was built in 1942 it was common practice to combine the sewer and storm water runoff… |
$8,317,000 |
Saint Louis |
MO |
0 |
-1 |
| Contract |
RAY Building Cafeteria Upgrade - A/E Services under ARRA funding include: cafeteria remodeling with EnergyStar equipment upgrades |
$117,389 |
Saint Louis |
MO |
1 |
0 |
| Contract |
Kaskia River ortho photos |
$30,575 |
Saint Louis |
MO |
0 |
-2 |
| Contract |
Contractor shall prepare narratives and identify methodologies, and summarize results, conclusions and recommendations for the various areas of work. Contractor… |
$200,000 |
Saint Louis |
MO |
1 |
0 |
| Contract |
Relocate/Upgrade B-50 Generator and Electrical for the Marion, Illinois, VA Medical Center in Marion, IL. |
$97,774 |
Saint Louis |
MO |
5 |
0 |
| Contract |
Construction Management Services for the Cafeteria Project at the Robert A Young Federal Building.Pre-Construction Services (of approximately 1-month) and CM… |
$80,371 |
Saint Louis |
MO |
0 |
0 |
| Contract |
The work to be performed under Task Order No. DD01 consists of services to prepare a Design Documentation Report and… |
$1,961,565 |
Saint Louis |
MO |
2 |
-1 |
| Contract |
Work received by the Jacobs/Stantec Joint Venture as Task Order 0009 through contract W912QR-08-D-0005 with the Louisville District Corps of… |
$220,535 |
Saint Louis |
MO |
1 |
0 |
| Contract |
TAS::96 3134::TAS Main Lock Culvert Valve Machinery Study Phase I, Melvin Price Locks and Dam, Mississippi River, Preliminary Engineering report,… |
$42,777 |
Saint Louis |
MO |
0 |
0 |
| Contract |
RAY Building Wind Turbine & PV Feasibility A/E Services under ARRA funding include: installation of several wind turbine, electrical generators,… |
$49,892 |
Saint Louis |
MO |
0 |
0 |
| Contract |
Yuma Area Office Seismic Rehabilitation |
$145,250 |
Saint Louis |
MO |
0 |
-1 |
| Contract |
The following is a general description from the contract award. More detailed information will be available after we receive task… |
$1,000,000 |
Saint Louis |
MO |
0 |
-1 |
| Contract |
A/E Services under ARRA for Thomas F. Eagleton Courthouse High Performance Green Bldg. - Lighting improvement: A high-performance lighting replacement… |
$321,566 |
Saint Louis |
MO |
2 |
0 |
| Contract |
The Robert A. Young (RAY) Federal Bulding (1,004,784 rsf, 1,131,935 gsf) stands at 21 stories tall and provides functional office… |
$7,008,200 |
Saint Louis |
MO |
0 |
-1 |
| Contract |
This work consists of providing one cutterhead hydraulic dredge and attendant plant to perform channel maintenance dredging and environmental dredging… |
$1,534,000 |
Saint Louis |
MO |
23 |
-1 |
| Contract |
RAY Building RCx A/E Services under ARRA funding include: total building re-commissioning/retro-commissioning assistance |
$54,910 |
Saint Louis |
MO |
0 |
-1 |
| Contract |
Construction Management Services for the Sanitary and Storm Sewer Project at the Goodfellow complex.Provide CM services for the Design Phase.… |
$45,149 |
Saint Louis |
MO |
0 |
-1 |
| Contract |
Mod 12 - Contract Administration for Renovation of San Antonio Post Office & Courthouse. Mod 14 - Design of temporary… |
$1,550,750 |
Saint Louis |
MO |
3 |
-4 |
| Contract |
McClellan-Kerr Arkansas River Navigation System Lifting Beam and 50' and 60' stoplogs, AR. Work is scheduled to begain in October… |
$5,907,842 |
Saint Louis |
MO |
0 |
-1 |