| Contract |
Relocate/Upgrade B-50 Generator and Electrical for the Marion, Illinois, VA Medical Center in Marion, IL. |
$97,774 |
Saint Louis |
MO |
5 |
-1 |
| Contract |
Contractor shall prepare narratives and identify methodologies, and summarize results, conclusions and recommendations for the various areas of work. Contractor… |
$200,000 |
Saint Louis |
MO |
1 |
0 |
| Contract |
Boat serice through mastership agreement to move fleet and Schreve barge for gate modification at Service base and Mel Price… |
$25,151 |
Saint Louis |
MO |
0 |
0 |
| Contract |
Relocate/Upgrade B-50 Generator and Electrical for the Marion, Illinois, VA Medical Center in Marion, IL. |
$97,774 |
Saint Louis |
MO |
5 |
0 |
| Contract |
RAY Building Façade Renovation -A/E Services under ARRA funding include: window replacement, façade repair and restoration |
$287,735 |
Saint Louis |
MO |
4 |
0 |
| Contract |
Construction Management Services for the Cafeteria Project at the Robert A Young Federal Building.Pre-Construction Services (of approximately 1-month) and CM… |
$80,371 |
Saint Louis |
MO |
0 |
0 |
| Contract |
The scope of work includes five primary elements for two locations including the Thomas F Eagleton Courthouse in St. Louis,… |
$242,544 |
Saint Louis |
MO |
2 |
0 |
| Contract |
The work to be performed under Task Order No. DD01 consists of services to prepare a Design Documentation Report and… |
$1,961,565 |
Saint Louis |
MO |
2 |
-1 |
| Contract |
Task Order 1 under this IDIQ contract is to complete Periodic Inspections (PI) of 4 levee systems along the Mississippi… |
$508,151 |
Saint Louis |
MO |
1 |
0 |
| Contract |
Work received by the Jacobs/Stantec Joint Venture as Task Order 0009 through contract W912QR-08-D-0005 with the Louisville District Corps of… |
$220,535 |
Saint Louis |
MO |
1 |
0 |
| Contract |
Demo existing boiler controls and design/procure/install new upgraded boiler controls that are capable of remote operation. |
$1,488,960 |
Saint Louis |
MO |
0 |
0 |
| Contract |
TAS::96 3134::TAS Main Lock Culvert Valve Machinery Study Phase I, Melvin Price Locks and Dam, Mississippi River, Preliminary Engineering report,… |
$42,777 |
Saint Louis |
MO |
0 |
0 |
| Contract |
Lincoln shields handrail replacement |
$107,225 |
Saint Louis |
MO |
0 |
-1 |
| Contract |
RAY Building Wind Turbine & PV Feasibility A/E Services under ARRA funding include: installation of several wind turbine, electrical generators,… |
$49,892 |
Saint Louis |
MO |
0 |
0 |
| Contract |
This project will include installing a new HVAC and humidification system to meet the NARA 2009 requirements for file storage.… |
$5,184,000 |
Saint Louis |
MO |
0 |
-2 |
| Contract |
Yuma Area Office Seismic Rehabilitation |
$145,250 |
Saint Louis |
MO |
0 |
-1 |
| Contract |
Provide civil engineering and surveying design services for a project to repair and/or replace the following items located on the… |
$48,000 |
Saint Louis |
MO |
0 |
-1 |
| Contract |
The following is a general description from the contract award. More detailed information will be available after we receive task… |
$1,000,000 |
Saint Louis |
MO |
0 |
-1 |
| Contract |
Miscellaneous Construction materials - EXTENSION CORDS AND FLANGE WEDGE IN DIFFERENT SIZES FOR THE MELVIN PRICE LOCK AND DAM GATE… |
$2,974 |
Saint Louis |
MO |
0 |
0 |
| Contract |
A/E Services under ARRA for Thomas F. Eagleton Courthouse High Performance Green Bldg. - Lighting improvement: A high-performance lighting replacement… |
$321,566 |
Saint Louis |
MO |
2 |
0 |