| Contract |
A/E Services under ARRA for replacement of existing sewer system for Federal Center Complex, including separation of storm and sanitary… |
$26,588 |
Saint Louis |
MO |
1 |
-1 |
| Contract |
RAY Building RCx A/E Services under ARRA funding include: total building re-commissioning/retro-commissioning assistance |
$54,910 |
Saint Louis |
MO |
0 |
-1 |
| Contract |
Construction Management (Agency) Services for Construction of new federal Courthouse in Billings, Montana. Project will provide Construction Management (CM) Services… |
$64,460 |
Saint Louis |
MO |
0 |
-2 |
| Contract |
Construction Management Services for the Sanitary and Storm Sewer Project at the Goodfellow complex.Provide CM services for the Design Phase.… |
$45,149 |
Saint Louis |
MO |
0 |
-1 |
| Contract |
Construction Management Services for the Envelope Improvements at the Robert A Young Federal building.CM services includes the Preconstruction Phase toAttend… |
$25,703 |
Saint Louis |
MO |
0 |
-1 |
| Contract |
Mod 12 - Contract Administration for Renovation of San Antonio Post Office & Courthouse. Mod 14 - Design of temporary… |
$1,550,750 |
Saint Louis |
MO |
3 |
-4 |
| Contract |
Basic in-home digital converter box, antenna, and scanning assistance to those who have not been able to successfully complete the… |
$723,500 |
Saint Louis |
MO |
11 |
-10 |
| Contract |
McClellan-Kerr Arkansas River Navigation System Lifting Beam and 50' and 60' stoplogs, AR. Work is scheduled to begain in October… |
$5,907,842 |
Saint Louis |
MO |
0 |
-1 |
| Contract |
Correct Secondary power deficiencies at VA Medical Center - Jefferson Barracks. Replacement of obsolete back up power equipment in several… |
$887,700 |
Saint Louis |
MO |
0 |
2 |
| Contract |
Task order is for archtectural-engineering services to prepare a design-build Request for Proposal (RFP) package for the repair and renovation… |
$239,824 |
Saint Louis |
MO |
0 |
0 |
| Contract |
two new 750 CFM diesel engine rotary screw air compressors |
$102,190 |
Saint Louis |
MO |
0 |
-1 |
| Contract |
Design services for revised design development through construction documents; LEED (Sustainability) coordination, monitoring, and submittal. Rehabilitation Mammoth Cave Visitor Center… |
$630,007 |
Saint Louis |
MO |
0 |
0 |
| Contract |
A/E Services under ARRA Federal Center Building 104 VA include: new advanced metering; 1st floor re-commissioning/retro-commissioning, new high efficiency chillers… |
$26,261 |
Saint Louis |
MO |
0 |
-1 |
| Contract |
Provide Pre-Design and Design Review Servicesfor the building system modifications to meet NARA 2009 requirements for the VA file storage… |
$43,039 |
Saint Louis |
MO |
0 |
0 |
| Contract |
Construct three dormitories at the St. Louis Job Corps Center |
$10,425,000 |
Saint Louis |
MO |
0 |
-3 |
| Contract |
When the Federal Center was built in 1942 it was common practice to combine the sewer and storm water runoff… |
$8,317,000 |
Saint Louis |
MO |
0 |
-1 |
| Contract |
The Robert A. Young Building is a high rise historic brick strucutre approximately 1 million square foot in size, housing… |
$1,909,000 |
Saint Louis |
MO |
0 |
0 |
| Contract |
RAY Building Cafeteria Upgrade - A/E Services under ARRA funding include: cafeteria remodeling with EnergyStar equipment upgrades |
$117,389 |
Saint Louis |
MO |
1 |
0 |
| Contract |
Construction Management Services for the High Performance Green Building at the Thomas Eagleton Federal Courthouse.CM Services include attending Design Review… |
$24,953 |
Saint Louis |
MO |
0 |
0 |
| Contract |
Kaskia River ortho photos |
$30,575 |
Saint Louis |
MO |
0 |
-2 |