Below are the stimulus contracts, grants, and loans in this city. You can click on an award to read (and add to) its description. You can also discuss the award and vote on whether you are satisfied with it or not. For a more local view, you can drill down to awards in a particular city. Just choose a city from the following list.
The total of cost of all the projects submitted by Boston is $2,241,896,680.05
View demographic, economic, housing and other information about the 02111 Zip code on VeryLocalData.com
| Type |
Description |
Amount |
City |
State |
Jobs |
Vote |
| Grant |
Head Start / Early Head Start |
$1,405,353 |
Boston |
MA |
0 |
0 |
| Grant |
RECLAMATION OF ATHOL, RICHMAND RD (RTE 32) FROM ELM AVE TO NH SL. |
$1,000,000 |
Boston |
MA |
0 |
0 |
| Grant |
FOOTPRINT ROAD REHAB PROJECT RTE 169(NO.WOODSTOCK RD) SEE ALSO STP |
$2,000,000 |
Boston |
MA |
0 |
0 |
| Grant |
FIBER OPTIC CONNECT 3 LOC CAMBRIDGE RT 2-MBTA ALEWIFE, NEWTON REST AREA RT.128 TO MBTA, FRAMINGHAM |
$1,400,000 |
Boston |
MA |
0 |
0 |
| Grant |
Head Start Expansion |
$395,947 |
Boston |
MA |
0 |
0 |
| Grant |
DESIGN-BUILD INTERCHANGE CONSTRUCTION OF ROUTE 24. |
$70,172,997 |
Boston |
MA |
1 |
0 |
| Grant |
NORTH BANK BRIDGE (B-16-302 - C-1-8) RIVER WALK / CHARLES RIVER |
$35,526,290 |
Boston |
MA |
0 |
4 |
| Grant |
RESURFACING AND RELATED WORK |
$3,523,180 |
Boston |
MA |
0 |
0 |
| Grant |
INTERSECTION AND SIGNAL IMPROVEMENTS ON DORCESTER AVE. |
$15,729,549 |
Boston |
MA |
0 |
-1 |
| Grant |
CCTV INSTALLATION OF SIGNALIZED INTERSECTIONS (ITS) |
$1,613,346 |
Boston |
MA |
0 |
0 |
| Grant |
HYANNIS TERMINAL SLIP IMPROVEMENTS |
$5,000,000 |
Boston |
MA |
0 |
0 |
| Grant |
VIDEO SYSTEM UPGRADES IP BASED VIRTUAL MATRIX SWITCH (ITS) SEE STP |
$1,000,000 |
Boston |
MA |
0 |
0 |
| Grant |
COMMUNICATION EQUIPMENT INSTALLATION AT 5 LOCATIONS & FIBER OPTIC CONNECTION EXISTING CONDUIT 3 LOCA |
$908,172 |
Boston |
MA |
0 |
0 |
| Grant |
Head Start |
$220,238 |
Boston |
MA |
0 |
0 |
| Grant |
Acquisition of an EPR spectrometer for cyber-enabled research and education |
$523,468 |
Boston |
MA |
0 |
0 |
| Grant |
Measurement of the Deuterium Kinetic Isotope Effect on Hydroxyl Radical Cleavage of RNA |
$649,456 |
Boston |
MA |
1 |
0 |
| Grant |
CAREER: Nonlinear Control for Single Molecule Tracking |
$430,000 |
Boston |
MA |
0 |
0 |
| Grant |
CAREER: Combined Light and Carrier Localization in High-refractive Index Silicon Nanocrystal Structures: a Novel Approach for Si-based Lasers |
$400,000 |
Boston |
MA |
0 |
0 |
| Grant |
Effects of Variability on Early Word Learning |
$242,449 |
Boston |
MA |
1 |
0 |
| Grant |
Liver Reengineering |
$98,847 |
Boston |
MA |
0 |
1 |