Below are the stimulus contracts, grants, and loans in this city. You can click on an award to read (and add to) its description. You can also discuss the award and vote on whether you are satisfied with it or not. For a more local view, you can drill down to awards in a particular city. Just choose a city from the following list.
The total of cost of all the projects submitted by Boston is $2,241,896,680.05
View demographic, economic, housing and other information about the 02108 Zip code on VeryLocalData.com
| Type |
Description |
Amount |
City |
State |
Jobs |
Vote |
| Grant |
State Fiscal Stabilization Fund - Education Stabilization Fund |
$544,913,152 |
Boston |
MA |
3,800 |
-10 |
| Grant |
The Numeraire in Stochastic Finance Theory |
$173,982 |
Boston |
MA |
0 |
-4 |
| Contract |
The renovation of two existing clinics located in the Boston Area. The first will include the renovation at the medical… |
$1,057,380 |
Boston |
MA |
9 |
-4 |
| Contract |
FIIS Fire Island National Seashore / Design & Construction of the Patchogue Ferry Terminal |
$39,694 |
Boston |
MA |
1 |
-4 |
| Contract |
Our proposed IDS project will enable us to create two new primary care teams, which will equal eight new FTE… |
$664,663 |
Boston |
MA |
7 |
-3 |
| Contract |
The work under this Task Order will support the work of the Agency for Healthcare Research and Quality (AHRQ) Effective… |
$1,000,000 |
Boston |
MA |
0 |
-3 |
| Contract |
Roof replacement of McCormack Federal Bldg Boston, MA. |
$1,448,416 |
Boston |
MA |
0 |
-3 |
| Contract |
Architect/Engineer Services, Repair and Alterations, IRS Service Center, Andover, MA. PS16 Design for complete replacement of HVAC system, PS21 Design… |
$1,877,980 |
Boston |
MA |
1 |
-3 |
| Contract |
To increase access to primary medical care to serve the Asian Community in Massachusetts. Funds will be used to support… |
$296,522 |
Boston |
MA |
2 |
-3 |
| Contract |
Provide architectural, and engineering services for Extra Field Investigation (EFI), Design and Post Contract Construction Services (Option 1) related to… |
$50,191 |
Boston |
MA |
0 |
-2 |
| Contract |
The Corps of Engineers as part of its Ecosystem Restoration Study along the Connecticut River is in need of several… |
$69,963 |
Boston |
MA |
0 |
-2 |
| Contract |
Provide architectural, and engineering services for Extra Field Investigation (EFI), Design and Post Contract Construction Services (Option 1) related to… |
$177,787 |
Boston |
MA |
0 |
-2 |
| Contract |
Preliminary determination of contamination (types, extent, risks); clean-up alternatives, cost estimates. THIS TASK ORDER HAS A STOP WORK ORDER NOTIFICATION… |
$7,714 |
Boston |
MA |
0 |
-2 |
| Grant |
AIRWAYS EOSINOPHILS AS ANTIGEN-PRESENTING CELLS IN ASTHMA |
$291,191 |
Boston |
MA |
0 |
-2 |
| Grant |
Mass Energy Efficiency and Conservation Block Grant |
$14,752,100 |
Boston |
MA |
0 |
-1 |
| Grant |
THROMBOSPONDIN 4 A1 |
$711,148 |
Boston |
MA |
3 |
-1 |
| Grant |
Neuroimaging Analysis Center |
$1,805,072 |
Boston |
MA |
0 |
-1 |
| Grant |
Neuroimaging Analysis Center |
$915,795 |
Boston |
MA |
2 |
-1 |
| Grant |
Self-Renewal Leukemic Stem |
$266,061 |
Boston |
MA |
1 |
-1 |
| Grant |
Collarorative Research: The Learning Bridge |
$74,518 |
Boston |
MA |
0 |
-1 |