Below are the stimulus contracts, grants, and loans in this city. You can click on an award to read (and add to) its description. You can also discuss the award and vote on whether you are satisfied with it or not. For a more local view, you can drill down to awards in a particular city. Just choose a city from the following list.
The total of cost of all the projects submitted by Lexington is $73,056,060.60
View demographic, economic, housing and other information about the 40511 Zip code on VeryLocalData.com
| Type |
Description |
Amount |
City |
State |
Jobs |
Vote |
| Grant |
An Intervention for Promoting Smoke-free Policy Development in Rural Kentucky |
$19,780 |
Lexington |
KY |
1 |
-1 |
| Contract |
Furnish all equipment, labor, layouts of work features, and supervision necessary for Sutton Well Cleanout, Sutton Lake, Sutton, WV. |
$484,754 |
Lexington |
KY |
5 |
0 |
| Contract |
Provide Laser Printers support to the State Disability Determination Sites and Printers Laser support to the Baltimore National Hearing Center. |
$102,778 |
Lexington |
KY |
0 |
0 |
| Contract |
Perform a levee safety Periodic Inspection (PI) on federally authorized levee systems indicated in the contract. |
$2,697,573 |
Lexington |
KY |
0 |
0 |
| Contract |
Provide labor, material, supplies, and supervision necessary toperform drainage lengthening at Sutton Dam, Sutton, WV. |
$190,000 |
Lexington |
KY |
2 |
0 |
| Contract |
A/E Services at Green River Lock and Dam 3, Rochester, Kentucky. |
$440,291 |
Lexington |
KY |
0 |
0 |
| Contract |
This project consists of post processing of the LiDAR data previously collected under Phase 1 of the Mississippi Delta LiDAR… |
$1,997,000 |
Lexington |
KY |
5 |
0 |
| Contract |
Furnish all equipment, labor, layouts of work features, and supervision necessary for Sutton Dam DSA Evaluation, Sutton Dam, Sutton, WV. |
$193,229 |
Lexington |
KY |
0 |
0 |
| Contract |
Provide all supplies,material, labor and supervision necessary for periodic inspection, Ohio River Basin River Miles 182.3 through 317.6 |
$872,162 |
Lexington |
KY |
8 |
0 |
| Contract |
Received contract modifications for additional engineering services: Modification P00043 for $493,200 on 09/18/2009 |
$493,200 |
Lexington |
KY |
0 |
0 |