Below are the stimulus contracts, grants, and loans in this city. You can click on an award to read (and add to) its description. You can also discuss the award and vote on whether you are satisfied with it or not. For a more local view, you can drill down to awards in a particular city. Just choose a city from the following list.
The total of cost of all the projects submitted by Mcconnell Afb is $28,584,373.64
| Type |
Description |
Amount |
City |
State |
Jobs |
Vote |
| Contract |
Install ground source heat pumps,the principal items of work include, but no limited to demolishing existing HVAC system at bldg… |
$82,462 |
Mcconnell Afb |
KS |
9 |
-1 |
| Contract |
All design and engineering activities for Hangar 1106 including fixtures and wiring drawings and All work associated with replacing fixtures,… |
$158,549 |
Mcconnell Afb |
KS |
0 |
0 |
| Contract |
All design and engineering activities for Hangar 1106 including fixtures and wiring drawings and All work associated with replacing fixtures,… |
$158,549 |
Mcconnell Afb |
KS |
10 |
0 |
| Contract |
A&H/LES JV, LLC will be renovating Building 350 at McConnell AFB, KS. The scope of work will inlcude:Rework the complete… |
$3,437,913 |
Mcconnell Afb |
KS |
0 |
0 |
| Contract |
Repair building 1127 for SOAR. Abate asbestos from building, install new exit lights and pull stations at each exit, install… |
$670,079 |
Mcconnell Afb |
KS |
8 |
0 |
| Contract |
Repair Roof Seals, B/1115. Removed metal soffit on the outside of the facility, injected a low expansion foam material to… |
$35,162 |
Mcconnell Afb |
KS |
0 |
0 |
| Contract |
A&H/LES JV, LLC will convert an existing steam / hot water heater system to a hot water only system for… |
$612,410 |
Mcconnell Afb |
KS |
0 |
0 |
| Contract |
A&H/LES JV, LLC will design and construction for repair of Flight Simulator Building 1094 at McConnell AFB, KS. The project… |
$2,116,779 |
Mcconnell Afb |
KS |
0 |
0 |
| Contract |
A&H/LES JV, LLC shall perform all design and construction work consisting of furnishing all plant, labor, equipment, supplies, and materials,… |
$101,510 |
Mcconnell Afb |
KS |
0 |
0 |
| Contract |
Repair OH Electrical |
$21,210,961 |
Mcconnell Afb |
KS |
0 |
-1 |