Below are the stimulus contracts, grants, and loans in this city. You can click on an award to read (and add to) its description. You can also discuss the award and vote on whether you are satisfied with it or not. For a more local view, you can drill down to awards in a particular city. Just choose a city from the following list.
The total of cost of all the projects submitted by Benton is $34,654,830.05
View demographic, economic, housing and other information about the 62812 Zip code on VeryLocalData.com
| Type |
Description |
Amount |
City |
State |
Jobs |
Vote |
| Contract |
Rend Lake Spillway Bridge Repair; Railroad Bridge Removal; Dredge of Silted-In Boating Areas; and Kaskaskia River Navigation Excavation in Benton,… |
$3,641,984 |
Benton |
IL |
0 |
0 |
| Contract |
Establishment of Turf, Placement of Rip Rap, and Installing Gate |
$89,427 |
Benton |
IL |
9 |
-1 |
| Contract |
Contractor to furnish all Labor, Equipment and Material necessary to deliver Rip Rap and Bedding Stone at Rend Lake Marina |
$55,079 |
Benton |
IL |
0 |
0 |
| Contract |
Replace designated doors with fiberglass reinforced plastic doors in the North and South Sandusky Recreational Areas. Design and construct utility… |
$4,142,014 |
Benton |
IL |
1 |
-2 |
| Contract |
Preparing Sites and Placing Rip Rap |
$18,007 |
Benton |
IL |
4 |
0 |
| Contract |
Bituminous surface removal,Bituminous Binder Course, Surface Course, Prime Coat, Crack Sealing, Aggregate Base, Course, Striping, Reflective Crack Control. |
$197,147 |
Benton |
IL |
4 |
0 |
| Contract |
Contractor to furnish all Labor, Equipment and Material necessary to deliver Rip Rap and Bedding Stone at Rend Lake Marina |
$35,249 |
Benton |
IL |
0 |
0 |
| Contract |
impact site replacement |
$40,600 |
Benton |
IL |
1 |
0 |
| Contract |
Rend Lake is located on the Big Muddy River, Illinois and is a federal flood control reservoir for water supply,… |
$8,242,183 |
Benton |
IL |
4 |
0 |
| Contract |
Contractor to furnish all Labor, Equipment and Material necessary to deliver Rip Rap and Bedding Stone at Rend Lake Marina |
$207,064 |
Benton |
IL |
0 |
0 |
| Contract |
Rend Lake Campgrounds and Day Use Area Upgrades, Rend Lake, Benton, IL. |
$2,338,365 |
Benton |
IL |
0 |
0 |
| Contract |
To provide a Work Plan/Design required to execute the repair/renewal/construction effort for Rend Lake Spillway Campgrounds and Day Use Area… |
$3,646,489 |
Benton |
IL |
0 |
0 |
| Contract |
Contractor to furnish all Labor, Equipment and Material necessary to deliver Rip Rap and Bedding Stone at Rend Lake Marina |
$101,403 |
Benton |
IL |
0 |
0 |
| Contract |
Contractor to furnish all Labor, Equipment and Material necessary to deliver Rip Rap and Bedding Stone at Rend Lake Marina |
$183,686 |
Benton |
IL |
0 |
0 |
| Grant |
(SOUTHBOUND) |
$9,197,918 |
Benton |
IL |
16 |
0 |
| Grant |
FAP 726 |
$2,518,216 |
Benton |
IL |
8 |
0 |