Awards in Benton, Illinois

Below are the stimulus contracts, grants, and loans in this city. You can click on an award to read (and add to) its description. You can also discuss the award and vote on whether you are satisfied with it or not. For a more local view, you can drill down to awards in a particular city. Just choose a city from the following list.

The total of cost of all the projects submitted by Benton is $34,654,830.05

Type Description Amount City State Jobs Vote
Contract Rend Lake Spillway Bridge Repair; Railroad Bridge Removal; Dredge of Silted-In Boating Areas; and Kaskaskia River Navigation Excavation in Benton,… $3,641,984 Benton IL 0 0
Contract Establishment of Turf, Placement of Rip Rap, and Installing Gate $89,427 Benton IL 9 -1
Contract Contractor to furnish all Labor, Equipment and Material necessary to deliver Rip Rap and Bedding Stone at Rend Lake Marina $55,079 Benton IL 0 0
Contract Replace designated doors with fiberglass reinforced plastic doors in the North and South Sandusky Recreational Areas. Design and construct utility… $4,142,014 Benton IL 1 -2
Contract Preparing Sites and Placing Rip Rap $18,007 Benton IL 4 0
Contract Bituminous surface removal,Bituminous Binder Course, Surface Course, Prime Coat, Crack Sealing, Aggregate Base, Course, Striping, Reflective Crack Control. $197,147 Benton IL 4 0
Contract Contractor to furnish all Labor, Equipment and Material necessary to deliver Rip Rap and Bedding Stone at Rend Lake Marina $35,249 Benton IL 0 0
Contract impact site replacement $40,600 Benton IL 1 0
Contract Rend Lake is located on the Big Muddy River, Illinois and is a federal flood control reservoir for water supply,… $8,242,183 Benton IL 4 0
Contract Contractor to furnish all Labor, Equipment and Material necessary to deliver Rip Rap and Bedding Stone at Rend Lake Marina $207,064 Benton IL 0 0
Contract Rend Lake Campgrounds and Day Use Area Upgrades, Rend Lake, Benton, IL. $2,338,365 Benton IL 0 0
Contract To provide a Work Plan/Design required to execute the repair/renewal/construction effort for Rend Lake Spillway Campgrounds and Day Use Area… $3,646,489 Benton IL 0 0
Contract Contractor to furnish all Labor, Equipment and Material necessary to deliver Rip Rap and Bedding Stone at Rend Lake Marina $101,403 Benton IL 0 0
Contract Contractor to furnish all Labor, Equipment and Material necessary to deliver Rip Rap and Bedding Stone at Rend Lake Marina $183,686 Benton IL 0 0
Grant (SOUTHBOUND) $9,197,918 Benton IL 16 0
Grant FAP 726 $2,518,216 Benton IL 8 0