A PHP Error was encountered

Severity: Notice

Message: Undefined index: GU

Filename: controllers/performance_places.php

Line Number: 55

96913 | GU | Performance Place | StimulusWatch.org

Awards in Barrigada, http://stimuluswatch.org/2.0/performance_places/state/GU

Below are the stimulus contracts, grants, and loans in this city. You can click on an award to read (and add to) its description. You can also discuss the award and vote on whether you are satisfied with it or not. For a more local view, you can drill down to awards in a particular city. Just choose a city from the following list.

The total of cost of all the projects submitted by Barrigada is $71,206,094.55

Type Description Amount City State Jobs Vote
Contract Replace deteriorated asphalt pavement, Taxiway Charlie Hardstands (C18, C20, C22,C24,26) AJJY 02-1103E $1,936,000 Barrigada GU 20 0
Contract Replace deteriorated asphalt pavement, Taxiway Charlie Hardstands (C57, C62,C66, C70) AJJY 02-1103B $1,936,000 Barrigada GU 20 0
Contract Replace deteriorated asphalt pavement, Taxiway Charlie Hardstands (C29 TO C42) AJJY 02-1103D $1,936,000 Barrigada GU 20 0
Contract Replace deteriorated asphalt pavement, Taxiway Charlie Hardstands (C2 to C14), AJJY 06-1103 $1,936,000 Barrigada GU 20 0
Contract Replace deteriorated asphalt pavement, Taxiway Bravo Hardstands (S58 to S70), AJJY 06-1099 $2,151,000 Barrigada GU 20 0
Contract Replace deteriorated asphalt pavement, at Crumm Avenue, AJJY 06-7200G $149,286 Barrigada GU 20 0
Contract Replace deteriorated asphalt pavement, Taxiway Bravo Hardstands (S72, S74, S76) AJJY 06-1100 $807,000 Barrigada GU 20 0
Contract Replace deteriorated asphalt pavement, Taxiway Charlie between Twy J & K, AJJY 07-7208P4 $6,239,000 Barrigada GU 20 0
Contract Replace deteriorated asphalt pavement, Taxiway Charlie Hardstands (C44, C45, C47, C49, C53) AJJY 02-1103C $1,936,000 Barrigada GU 20 0
Contract ARRA MODERNIZE UROLOGY/ORTHOPEDIC SUITES $490,160 Barrigada GU 1 0
Grant Route 2 Culvert and Slide Repair $1,582,000 Barrigada GU 0 0
Grant Route 4 rehabilitation (Ylig Bridge to Pago Bay) and resurfacing (Ylig Bridge to Route 17) $4,400,000 Barrigada GU 0 0
Grant Masso River Bridge Embankment Restoration $220,000 Barrigada GU 0 0
Grant Route 25 Reconstruction and Widening $6,500,000 Barrigada GU 0 0
Grant Route 17 Rehabilitation and Widening from Route 4 to Route 4A (Phase 1) $5,298,000 Barrigada GU 0 0
Grant Child Care and Development Fund (CCDF) $3,740,906 Barrigada GU 2 0
Grant 2009 CSBG ARRA $1,230,195 Barrigada GU 0 0
Grant ARRA Congregate Nutrition Services $162,500 Barrigada GU 0 0
Grant ARRA Home-Delivered Nutrition Services $80,000 Barrigada GU 0 0
Grant ARRA-Increase Services to Health Centers $310,184 Barrigada GU 2 0
Page: 1 2 >