| Contract |
Remove old joint sealant and replace with new LOX sealant. The purpose is to facilitate government testing. |
$4,285 |
Eglin Afb |
FL |
2 |
0 |
| Contract |
Install new waterline to Bldg. 130 for washing town test station for aircraft. |
$6,810 |
Eglin Afb |
FL |
2 |
0 |
| Contract |
Install new power, fire alarm and HVAC to existing building. |
$89,890 |
Eglin Afb |
FL |
7 |
-1 |
| Contract |
PREP PRESSURE WASH,PRIME AND PAINT EXTERIORS OF #75 BUILDING LOCATED AT EGLIN AIR FORCE BASE FLORIDA |
$474,323 |
Eglin Afb |
FL |
3 |
0 |
| Contract |
Remove old flooring and install new epoxy floor coating system in Bldg. 8640. |
$295,532 |
Eglin Afb |
FL |
8 |
-1 |
| Contract |
Install new communication equipment to remote water well sites. |
$298,901 |
Eglin Afb |
FL |
4 |
0 |
| Contract |
SCOPE: This Statement of Work (SOW) sets forth basic requirements for the design and construction of Antiterrorism and Force Protection… |
$1,190,670 |
Eglin Afb |
FL |
4 |
-1 |
| Contract |
Design/Build Hurricane Safe Room (Bldg 8640, Site C-6) |
$285,770 |
Eglin Afb |
FL |
4 |
-1 |
| Contract |
Install new concrete pad for dumpster access. |
$9,862 |
Eglin Afb |
FL |
2 |
-2 |
| Contract |
PREP, PREESUE WASH , PRIME AND PAINT EXTERIOR ROOFS AT 33 RD FIGHTERR WING AT EGLIN AIR FORCE BASE. 25… |
$189,604 |
Eglin Afb |
FL |
3 |
0 |
| Contract |
Replace existing transformer |
$14,572 |
Eglin Afb |
FL |
2 |
0 |
| Contract |
The purpose of this project is to conduct a biomass and waste-to-energy feasibility study that will address: Awareness and cultural… |
$499,799 |
Eglin Afb |
FL |
3 |
-4 |
| Contract |
PREP PRESSURE WASH ,PRIME AND PAINT #92 BUILDING LOCATED AT EGLIN AIR FORCE BASE. |
$493,163 |
Eglin Afb |
FL |
3 |
0 |
| Contract |
PREP PRESSURE WASH , PRIME AND PAINT EXTERIOR OF #79 BUILDING LOCATED AT DUKE FEILD EGLIN AIR FORCE BASE |
$468,036 |
Eglin Afb |
FL |
1 |
0 |
| Contract |
PROVDE LEAD ABATEMENT TEAM TO REMOVE THE LEAD AND REPAINT HISTORICAL BUILDING ON WATER FRONT |
$39,867 |
Eglin Afb |
FL |
1 |
0 |
| Contract |
Install Reflective Coating, Building 1392. Furnish all plant, labor, materials, and equipment, and perform all operations required to install high… |
$268,800 |
Eglin Afb |
FL |
1 |
0 |
| Contract |
RESTRIPE PARKING LOT AT DORM #19 EGLIN AIR FORCE BASE FLORIDA. |
$6,179 |
Eglin Afb |
FL |
1 |
-1 |
| Contract |
Replace HVAC at Building 89 Eglin AFB, FL |
$114,280 |
Eglin Afb |
FL |
0 |
0 |
| Contract |
RESTRIPE PAVEMENT AT 33RD WASH RACK EGLIN AIR FORCE BASE |
$3,750 |
Eglin Afb |
FL |
1 |
0 |
| Contract |
Install an new generator and transfer switch to operate water well. |
$88,267 |
Eglin Afb |
FL |
3 |
0 |