Below are the stimulus contracts, grants, and loans in this city. You can click on an award to read (and add to) its description. You can also discuss the award and vote on whether you are satisfied with it or not. For a more local view, you can drill down to awards in a particular city. Just choose a city from the following list.
The total of cost of all the projects submitted by Panama City is $69,787,417.32
View demographic, economic, housing and other information about the 32404 Zip code on VeryLocalData.com
| Type |
Description |
Amount |
City |
State |
Jobs |
Vote |
| Contract |
Install Concrete Pad. Mobilize, saw cut and construct a concrete pavement including painting as per drawings. |
$138,138 |
Panama City |
FL |
0 |
0 |
| Contract |
Extend Overrun Runway. Mobilize and provide a 2' asphalt layer on 18 end overrun at the Drone runway as per… |
$304,078 |
Panama City |
FL |
0 |
-1 |
| Contract |
Extend Flightline Road. |
$54,159 |
Panama City |
FL |
0 |
0 |
| Contract |
Grand Lagoon Bridge Replacement |
$19,462,409 |
Panama City |
FL |
0 |
-4 |
| Contract |
Repair Parking Lot Between Bldg 208/205 Tyndall AFB, FL |
$106,195 |
Panama City |
FL |
0 |
0 |
| Contract |
DEPLOYABLE MULTI-FUEL ELECTRIC GENERATOR |
$1,943,902 |
Panama City |
FL |
0 |
-1 |
| Contract |
Repair Overruns, Drone Runway. Mobilize and provide 2' asphalt layer on each overrun at the Drone runway as per drawings. |
$713,500 |
Panama City |
FL |
0 |
0 |
| Contract |
GLOBAL SOLAR WIND PREDICTIVE MODEL FOR AIR FORCE INSTALLATIONS |
$965,520 |
Panama City |
FL |
0 |
1 |
| Contract |
Quantity 1, 25' Towboat |
$296,125 |
Panama City |
FL |
0 |
0 |
| Contract |
Maintain Paint Airfield. Paint approximately 501,505 SF of airfield marking and remove approximately 47,369 SF in preparation of new painted… |
$318,052 |
Panama City |
FL |
0 |
0 |
| Contract |
Slurry Seal Inside Runway. Mobilize and slurry seal areas indicated on drawings. Remove rubber from both touch down zones as… |
$291,476 |
Panama City |
FL |
0 |
0 |
| Contract |
Repair Joints Phase III. |
$199,995 |
Panama City |
FL |
0 |
0 |
| Contract |
Repair Parking Lot 546, Tyndall AFB, FL |
$168,783 |
Panama City |
FL |
0 |
0 |
| Contract |
PROVIDE PORTABLE WATER, AMMO AREA |
$629,118 |
Panama City |
FL |
0 |
0 |
| Grant |
Office Safety/Citizen Response Equipment Upgrade |
$37,624 |
Panama City |
FL |
0 |
0 |
| Grant |
LAN upgrade |
$155,430 |
Panama City |
FL |
0 |
0 |
| Grant |
Construct Transit Facility |
$2,377,250 |
Panama City |
FL |
0 |
0 |
| Grant |
Edgewood Garden Apts |
$111,926 |
Panama City |
FL |
0 |
0 |
| Grant |
Pana Villa Apartments |
$185,692 |
Panama City |
FL |
0 |
0 |
| Grant |
St. Andrews Towers Apartments |
$1,684,800 |
Panama City |
FL |
0 |
1 |