| Contract |
Community Development activities |
$107,827 |
Panama City |
FL |
5 |
-5 |
| Contract |
Ramp lighting flight line PH2 |
$2,996,792 |
Panama City |
FL |
4 |
0 |
| Contract |
Illinois Feeder PH11 |
$4,778,631 |
Panama City |
FL |
1 |
-4 |
| Contract |
Furnish all labor and materials, equipment and services required to paint the exterior and the interior bays of facility #7026. |
$65,303 |
Panama City |
FL |
2 |
-1 |
| Contract |
Furnish all labor and materials, equipment and services required to paint the exterior building 1476 (Chapel Annex). |
$34,873 |
Panama City |
FL |
2 |
-1 |
| Contract |
Furnish all labor and materials, equipment and services required to paint the exterior of Facility# 1260. |
$55,117 |
Panama City |
FL |
2 |
-1 |
| Contract |
Install Concrete Pad. Mobilize, saw cut and construct a concrete pavement including painting as per drawings. |
$138,138 |
Panama City |
FL |
0 |
0 |
| Contract |
Extend Overrun Runway. Mobilize and provide a 2' asphalt layer on 18 end overrun at the Drone runway as per… |
$304,078 |
Panama City |
FL |
0 |
-1 |
| Contract |
Extend Flightline Road. |
$54,159 |
Panama City |
FL |
0 |
0 |
| Contract |
Ramp Lighting Flight Line PH1 |
$2,998,028 |
Panama City |
FL |
4 |
-1 |
| Contract |
Repair Base Electrical Distribution - Phase 12 |
$4,526,266 |
Panama City |
FL |
1 |
0 |
| Contract |
Install ATF bollards Gate BL 9300 |
$117,491 |
Panama City |
FL |
0 |
0 |
| Contract |
Furnish all labor and materials, equipment and services required to paint the exterior,interior and the gutters/downspouts of Facility #546. |
$299,997 |
Panama City |
FL |
2 |
0 |
| Contract |
Cluster Award - New Access Point |
$1,300,000 |
Panama City |
FL |
2 |
-3 |
| Contract |
EXTENDED HOURS OF OPERATIONS FOR THE HEALTH CLINIC |
$144,987 |
Panama City |
FL |
3 |
-2 |
| Contract |
Grand Lagoon Bridge Replacement |
$19,462,409 |
Panama City |
FL |
0 |
-4 |
| Contract |
Repair Parking Lot Between Bldg 208/205 Tyndall AFB, FL |
$106,195 |
Panama City |
FL |
0 |
0 |
| Contract |
DEPLOYABLE MULTI-FUEL ELECTRIC GENERATOR |
$1,943,902 |
Panama City |
FL |
0 |
-1 |
| Contract |
DTS South shall provide all labor, tools, materials and equipment required to perform construction, maintenance, and restoration at facilities 280,295,370,421,9718,9433,9456,9466,9468,9480,9484,… |
$119,149 |
Panama City |
FL |
2 |
-1 |
| Contract |
INstall Lighting Check Pad 13R |
$636,272 |
Panama City |
FL |
1 |
0 |