Awards in Panama City, Florida

Below are the stimulus contracts, grants, and loans in this city. You can click on an award to read (and add to) its description. You can also discuss the award and vote on whether you are satisfied with it or not. For a more local view, you can drill down to awards in a particular city. Just choose a city from the following list.

The total of cost of all the projects submitted by Panama City is $69,787,417.32

Type Description Amount City State Jobs Vote
Contract EXTENDED HOURS OF OPERATIONS FOR THE HEALTH CLINIC $144,987 Panama City FL 3 -2
Contract Repair Parking Lot Between Bldg 208/205 Tyndall AFB, FL $106,195 Panama City FL 0 0
Contract DTS South shall provide all labor, tools, materials and equipment required to perform construction, maintenance, and restoration at facilities 280,295,370,421,9718,9433,9456,9466,9468,9480,9484,… $119,149 Panama City FL 2 -1
Contract Construct Fitness Center Silver Flag $623,156 Panama City FL 0 -3
Contract Repair Overruns, Drone Runway. Mobilize and provide 2' asphalt layer on each overrun at the Drone runway as per drawings. $713,500 Panama City FL 0 0
Contract Quantity 1, 25' Towboat $296,125 Panama City FL 0 0
Contract Extend Fire Supp System $135,851 Panama City FL 0 0
Contract Slurry Seal Inside Runway. Mobilize and slurry seal areas indicated on drawings. Remove rubber from both touch down zones as… $291,476 Panama City FL 0 0
Contract Repair Parking Lot 546, Tyndall AFB, FL $168,783 Panama City FL 0 0
Contract Repair Erosion Ammo Bunker 7000 $64,114 Panama City FL 0 0
Contract Community Development activities $107,827 Panama City FL 5 -5
Contract Illinois Feeder PH11 $4,778,631 Panama City FL 1 -4
Contract Furnish all labor and materials, equipment and services required to paint the exterior building 1476 (Chapel Annex). $34,873 Panama City FL 2 -1
Contract Install Concrete Pad. Mobilize, saw cut and construct a concrete pavement including painting as per drawings. $138,138 Panama City FL 0 0
Contract Extend Flightline Road. $54,159 Panama City FL 0 0
Contract Repair Base Electrical Distribution - Phase 12 $4,526,266 Panama City FL 1 0
Contract Furnish all labor and materials, equipment and services required to paint the exterior,interior and the gutters/downspouts of Facility #546. $299,997 Panama City FL 2 0
Contract Cluster Award - New Access Point $1,300,000 Panama City FL 2 -3
Contract Grand Lagoon Bridge Replacement $19,462,409 Panama City FL 0 -4
Contract DEPLOYABLE MULTI-FUEL ELECTRIC GENERATOR $1,943,902 Panama City FL 0 -1
Page: 1 2 3 >