| Contract |
EXTENDED HOURS OF OPERATIONS FOR THE HEALTH CLINIC |
$144,987 |
Panama City |
FL |
3 |
-2 |
| Contract |
Repair Parking Lot Between Bldg 208/205 Tyndall AFB, FL |
$106,195 |
Panama City |
FL |
0 |
0 |
| Contract |
DTS South shall provide all labor, tools, materials and equipment required to perform construction, maintenance, and restoration at facilities 280,295,370,421,9718,9433,9456,9466,9468,9480,9484,… |
$119,149 |
Panama City |
FL |
2 |
-1 |
| Contract |
Construct Fitness Center Silver Flag |
$623,156 |
Panama City |
FL |
0 |
-3 |
| Contract |
Repair Overruns, Drone Runway. Mobilize and provide 2' asphalt layer on each overrun at the Drone runway as per drawings. |
$713,500 |
Panama City |
FL |
0 |
0 |
| Contract |
Quantity 1, 25' Towboat |
$296,125 |
Panama City |
FL |
0 |
0 |
| Contract |
Extend Fire Supp System |
$135,851 |
Panama City |
FL |
0 |
0 |
| Contract |
Slurry Seal Inside Runway. Mobilize and slurry seal areas indicated on drawings. Remove rubber from both touch down zones as… |
$291,476 |
Panama City |
FL |
0 |
0 |
| Contract |
Repair Parking Lot 546, Tyndall AFB, FL |
$168,783 |
Panama City |
FL |
0 |
0 |
| Contract |
Repair Erosion Ammo Bunker 7000 |
$64,114 |
Panama City |
FL |
0 |
0 |
| Contract |
Community Development activities |
$107,827 |
Panama City |
FL |
5 |
-5 |
| Contract |
Illinois Feeder PH11 |
$4,778,631 |
Panama City |
FL |
1 |
-4 |
| Contract |
Furnish all labor and materials, equipment and services required to paint the exterior building 1476 (Chapel Annex). |
$34,873 |
Panama City |
FL |
2 |
-1 |
| Contract |
Install Concrete Pad. Mobilize, saw cut and construct a concrete pavement including painting as per drawings. |
$138,138 |
Panama City |
FL |
0 |
0 |
| Contract |
Extend Flightline Road. |
$54,159 |
Panama City |
FL |
0 |
0 |
| Contract |
Repair Base Electrical Distribution - Phase 12 |
$4,526,266 |
Panama City |
FL |
1 |
0 |
| Contract |
Furnish all labor and materials, equipment and services required to paint the exterior,interior and the gutters/downspouts of Facility #546. |
$299,997 |
Panama City |
FL |
2 |
0 |
| Contract |
Cluster Award - New Access Point |
$1,300,000 |
Panama City |
FL |
2 |
-3 |
| Contract |
Grand Lagoon Bridge Replacement |
$19,462,409 |
Panama City |
FL |
0 |
-4 |
| Contract |
DEPLOYABLE MULTI-FUEL ELECTRIC GENERATOR |
$1,943,902 |
Panama City |
FL |
0 |
-1 |