| Contract |
Repair Storm Drain Near Building 335. Mobilize and remove soil to replace storm drain pipe as indicated on drawings. All… |
$234,010 |
Panama City |
FL |
7 |
0 |
| Contract |
Maintain Paint Airfield. Paint approximately 501,505 SF of airfield marking and remove approximately 47,369 SF in preparation of new painted… |
$318,052 |
Panama City |
FL |
0 |
0 |
| Contract |
Repair Joints Phase III. |
$199,995 |
Panama City |
FL |
0 |
0 |
| Contract |
PROVIDE PORTABLE WATER, AMMO AREA |
$629,118 |
Panama City |
FL |
0 |
0 |
| Contract |
Ramp lighting flight line PH2 |
$2,996,792 |
Panama City |
FL |
4 |
0 |
| Contract |
Furnish all labor and materials, equipment and services required to paint the exterior and the interior bays of facility #7026. |
$65,303 |
Panama City |
FL |
2 |
-1 |
| Contract |
Furnish all labor and materials, equipment and services required to paint the exterior of Facility# 1260. |
$55,117 |
Panama City |
FL |
2 |
-1 |
| Contract |
Extend Overrun Runway. Mobilize and provide a 2' asphalt layer on 18 end overrun at the Drone runway as per… |
$304,078 |
Panama City |
FL |
0 |
-1 |
| Contract |
Ramp Lighting Flight Line PH1 |
$2,998,028 |
Panama City |
FL |
4 |
-1 |
| Contract |
Install ATF bollards Gate BL 9300 |
$117,491 |
Panama City |
FL |
0 |
0 |
| Contract |
EXTENDED HOURS OF OPERATIONS FOR THE HEALTH CLINIC |
$144,987 |
Panama City |
FL |
3 |
-2 |
| Contract |
Repair Parking Lot Between Bldg 208/205 Tyndall AFB, FL |
$106,195 |
Panama City |
FL |
0 |
0 |
| Contract |
DTS South shall provide all labor, tools, materials and equipment required to perform construction, maintenance, and restoration at facilities 280,295,370,421,9718,9433,9456,9466,9468,9480,9484,… |
$119,149 |
Panama City |
FL |
2 |
-1 |
| Contract |
Construct Fitness Center Silver Flag |
$623,156 |
Panama City |
FL |
0 |
-3 |
| Contract |
Repair Overruns, Drone Runway. Mobilize and provide 2' asphalt layer on each overrun at the Drone runway as per drawings. |
$713,500 |
Panama City |
FL |
0 |
0 |
| Contract |
Quantity 1, 25' Towboat |
$296,125 |
Panama City |
FL |
0 |
0 |
| Contract |
Extend Fire Supp System |
$135,851 |
Panama City |
FL |
0 |
0 |
| Contract |
Slurry Seal Inside Runway. Mobilize and slurry seal areas indicated on drawings. Remove rubber from both touch down zones as… |
$291,476 |
Panama City |
FL |
0 |
0 |
| Contract |
Repair Parking Lot 546, Tyndall AFB, FL |
$168,783 |
Panama City |
FL |
0 |
0 |
| Contract |
Repair Erosion Ammo Bunker 7000 |
$64,114 |
Panama City |
FL |
0 |
0 |