| Contract |
Provide an on-base source of dependable renewable photovoltaic (PV)electrical energy IAW Statement of Objectives, dated 30 Jun 09, and CSU… |
$18,300,000 |
Colorado Springs |
CO |
0 |
-5 |
| Contract |
REPAIR FLOOR DOG KENNEL |
$5,940 |
Colorado Springs |
CO |
1 |
-3 |
| Contract |
Provide all plant, labor, equipment, materials, design, engineering, and incidentals necessary to accomplish the following: Repair/Upgrade the Peterson Installation Control… |
$5,923,695 |
Colorado Springs |
CO |
4 |
-2 |
| Contract |
Upgrade fire detection, repair fire suppression and install AC units. |
$1,977,793 |
Colorado Springs |
CO |
5 |
-1 |
| Grant |
Recovery Act Health Center Cluster Program |
$1,300,000 |
Colorado Springs |
CO |
11 |
-1 |
| Contract |
Maint-Rep-Alt/Misc Bldgs |
$11,100 |
Colorado Springs |
CO |
0 |
-1 |
| Contract |
Maint-Rep-Alt/Misc Bldgs |
$10,780 |
Colorado Springs |
CO |
0 |
-1 |
| Grant |
Rehabilitate Taxiway E 4 from Sta.9-46.86 to Sta. 16-20.65, rehabilitate Taxiway E5 from Sta 9+46.29 to Sta 15+97.53 |
$6,740,778 |
Colorado Springs |
CO |
15 |
-1 |
| Contract |
CONSTRUCT BUS SHELTERS |
$125,339 |
Colorado Springs |
CO |
8 |
-1 |
| Contract |
REPLACE WINDOWS, ADMIN BLDG 503 |
$59,705 |
Colorado Springs |
CO |
5 |
-1 |
| Contract |
The contractor shall furnish all management, supervision, labor, materials, equipment, and incidentals required for a broad range of maintenance, repair… |
$99,890 |
Colorado Springs |
CO |
0 |
-1 |
| Contract |
BAND OF ROCKIES SIDEWALK |
$20,363 |
Colorado Springs |
CO |
3 |
-1 |
| Contract |
Maint-Rep-Alt/Misc Bldgs |
$87,850 |
Colorado Springs |
CO |
1 |
-1 |
| Contract |
CONSTRUCT COVERED MEETING AREA B1376 |
$54,174 |
Colorado Springs |
CO |
4 |
-1 |
| Contract |
The contractor shall furnish all management, supervision, labor, materials, equipment, and incidentals required for a broad range of maintenance, repair… |
$305,886 |
Colorado Springs |
CO |
0 |
-1 |
| Grant |
Colorado ICAC Task Force |
$675,991 |
Colorado Springs |
CO |
0 |
-1 |
| Grant |
Head Start 2009 ARRA COLA (1.8%)/Quality Improvement Funding |
$602,733 |
Colorado Springs |
CO |
269 |
-1 |
| Contract |
REPAIR & STABILIZE LAND SLIDE AREA |
$1,889,303 |
Colorado Springs |
CO |
12 |
0 |
| Contract |
Supply all material and labor to install steam and condensate meters in the Utilidor to provide data tie-ins to the… |
$346,306 |
Colorado Springs |
CO |
7 |
0 |
| Contract |
Maint-Rep-Alt/Misc Bldgs |
$464,263 |
Colorado Springs |
CO |
2 |
0 |