| Contract |
Recovery - RPR Roof Cactus Cafe, Bldg 1610. The contractor shall furnish all labor, material, equipment, and transportation to perform… |
$113,408 |
Edwards |
CA |
16 |
0 |
| Contract |
Recovery - Repair Roof Veh Maint B3511. The contractor shall furnish all labor, material, equipment, and transportation to perform all… |
$29,577 |
Edwards |
CA |
0 |
0 |
| Contract |
Recovery - Repair Energy Cool Roof B1633. The contractor shall furnish all labor, material, equipment, and transportation to perform all… |
$117,552 |
Edwards |
CA |
0 |
0 |
| Contract |
Site Demolition and Interior Construction |
$267,128 |
Edwards |
CA |
3 |
-1 |
| Contract |
Construct Guard House Roof |
$91,208 |
Edwards |
CA |
1 |
-4 |
| Contract |
Replace existing interior light fixtures and exterior light fixtures w/new energy-efficient flurescent fixtures. |
$546,402 |
Edwards |
CA |
0 |
0 |
| Contract |
Interior construction, Stairways, Interior finishes, Plumbing systems, Furnishings, Selective demolition and General Requirements. |
$164,477 |
Edwards |
CA |
1 |
0 |
| Contract |
objective: eliminate septic and holding tanks by provide access to a gravity sewer along Contractor's Row. |
$252,293 |
Edwards |
CA |
1 |
0 |
| Contract |
The Air Force Flight Test Center at Edwards AFB, CA, has requested that the following work be performed in Building… |
$62,959 |
Edwards |
CA |
1 |
0 |
| Contract |
Recovery - Repair Roof IT, Bldg 3950. The contractor shall furnish all labor, material, equipment, and transportation to perform all… |
$129,827 |
Edwards |
CA |
0 |
0 |
| Contract |
PAVE BURGER KING PARKING LOT, FIX STRIPPING. |
$187,143 |
Edwards |
CA |
0 |
-5 |
| Contract |
REPAIR OF BOILER AT THE RESEARCH LABORATORY, BLDG. 8620, EDWARD AFB, CA. |
$111,708 |
Edwards |
CA |
1 |
0 |
| Contract |
ARRA - Repair and Retrofit PH 1 HVAC Bldg 1. Providing special foundations to support the Thermal Energy Storage Tanks… |
$1,384,546 |
Edwards |
CA |
0 |
0 |
| Contract |
Repair Base Perimeter Fencing, Edwards AFB |
$1,862,863 |
Edwards |
CA |
20 |
0 |
| Contract |
Recovery - Paint/Wallpapaer Interior B6457. The contractor shall furnish all labor, material, equipment, and transportation to perform all work in… |
$94,313 |
Edwards |
CA |
8 |
0 |
| Contract |
Replacing all lamps, ballasts in existing interior flurescent light fixtures in the building and to provide and install new controls… |
$194,973 |
Edwards |
CA |
1 |
0 |
| Contract |
Replacing all lamps in existing interior flurescent light fixtures and provide and install new controls in offices. |
$150,830 |
Edwards |
CA |
1 |
0 |
| Contract |
Roof construction, painting, selective demolition & general requirements. |
$34,580 |
Edwards |
CA |
0 |
0 |
| Contract |
The Air Force Flight Test Center at Edwards AFB, CA requests the following work to be accomplished. The work to… |
$153,284 |
Edwards |
CA |
1 |
0 |
| Contract |
installation of a permantely-mounted emergency generator to power the area lighting |
$663,113 |
Edwards |
CA |
0 |
0 |