| Contract |
MC Construct Concrete Pad |
$21,915 |
Edwards |
CA |
0 |
0 |
| Contract |
Technology advancements, the overall cost of utilities, and the enactment of the Encrgy Policy Act of2005 (EPAct 2005) have moved… |
$25,357 |
Edwards |
CA |
1 |
0 |
| Contract |
Recovery - Repair Roof Veh Maint B3511. The contractor shall furnish all labor, material, equipment, and transportation to perform all… |
$29,577 |
Edwards |
CA |
0 |
0 |
| Contract |
Roof construction, painting, selective demolition & general requirements. |
$34,580 |
Edwards |
CA |
0 |
0 |
| Contract |
Repair/Replace HVAC equipment at the Edwards AFB Waste Water Treatment Plant. |
$38,431 |
Edwards |
CA |
1 |
0 |
| Contract |
ARRA - Repair Roof Bldg 8412. The work consists of, but not limited to, furnishing all labor materials, equipment and… |
$47,397 |
Edwards |
CA |
0 |
0 |
| Contract |
The Air Force Flight Test Center at Edwards AFB, CA, has requested that the following work be performed in Building… |
$62,959 |
Edwards |
CA |
1 |
0 |
| Contract |
The Air Force Flight Test Center (AFFTC) at Edwards Air Force Base (AFB), California has requested that the pole type… |
$63,955 |
Edwards |
CA |
1 |
0 |
| Contract |
Recovery - Repair Roof Fuel Fac, B2110. The contractor shall furnish all labor, material, equipment, and transportation to perform all… |
$74,328 |
Edwards |
CA |
0 |
0 |
| Contract |
The Air Force Flight Test Center at Edwards AFB, CA has requested the following work to be performed at Building… |
$82,469 |
Edwards |
CA |
1 |
0 |
| Contract |
Replacing all lamps in existing interior fluorescent light fixtures. Provide and install new controls in office areas and mechanical rooms |
$83,822 |
Edwards |
CA |
0 |
0 |
| Contract |
ARRA - FFP Repair Roof Bldg 3920. Provide all labor, materials, equipment and supervision required to repair the built-up roof… |
$84,367 |
Edwards |
CA |
7 |
0 |
| Contract |
Construct Guard House Roof |
$91,208 |
Edwards |
CA |
1 |
-4 |
| Contract |
Site preparation, site earthwork, site improvements. |
$91,302 |
Edwards |
CA |
1 |
-1 |
| Contract |
Recovery - Paint/Wallpapaer Interior B6457. The contractor shall furnish all labor, material, equipment, and transportation to perform all work in… |
$94,313 |
Edwards |
CA |
8 |
0 |
| Contract |
Replacement of existing interior light fixtures and exterior light fixtures with new energy-efficent flurescent fixtures and the disposal of all… |
$103,812 |
Edwards |
CA |
0 |
-1 |
| Contract |
Recovery - RPR Roof Equip Research B8354. The contractor shall furnish all labor, material, equipment, and transportation to perform all… |
$106,282 |
Edwards |
CA |
8 |
0 |
| Contract |
Recovery - Repair Energy Cool Roof B8350. The contractor shall furnish all labor, material, equipment, and transportation to perform all… |
$109,035 |
Edwards |
CA |
6 |
0 |
| Contract |
REPAIR OF BOILER AT THE RESEARCH LABORATORY, BLDG. 8620, EDWARD AFB, CA. |
$111,708 |
Edwards |
CA |
1 |
0 |
| Contract |
Recovery - RPR Roof Cactus Cafe, Bldg 1610. The contractor shall furnish all labor, material, equipment, and transportation to perform… |
$113,408 |
Edwards |
CA |
16 |
0 |