Below are the stimulus contracts, grants, and loans in this city. You can click on an award to read (and add to) its description. You can also discuss the award and vote on whether you are satisfied with it or not. For a more local view, you can drill down to awards in a particular city. Just choose a city from the following list.

The total of cost of all the projects submitted by Edwards is $32,350,328.37

Type Description Amount City State Jobs Vote
Contract MC Construct Concrete Pad $21,915 Edwards CA 0 0
Contract Technology advancements, the overall cost of utilities, and the enactment of the Encrgy Policy Act of2005 (EPAct 2005) have moved… $25,357 Edwards CA 1 0
Contract Recovery - Repair Roof Veh Maint B3511. The contractor shall furnish all labor, material, equipment, and transportation to perform all… $29,577 Edwards CA 0 0
Contract Roof construction, painting, selective demolition & general requirements. $34,580 Edwards CA 0 0
Contract Repair/Replace HVAC equipment at the Edwards AFB Waste Water Treatment Plant. $38,431 Edwards CA 1 0
Contract ARRA - Repair Roof Bldg 8412. The work consists of, but not limited to, furnishing all labor materials, equipment and… $47,397 Edwards CA 0 0
Contract The Air Force Flight Test Center at Edwards AFB, CA, has requested that the following work be performed in Building… $62,959 Edwards CA 1 0
Contract The Air Force Flight Test Center (AFFTC) at Edwards Air Force Base (AFB), California has requested that the pole type… $63,955 Edwards CA 1 0
Contract Recovery - Repair Roof Fuel Fac, B2110. The contractor shall furnish all labor, material, equipment, and transportation to perform all… $74,328 Edwards CA 0 0
Contract The Air Force Flight Test Center at Edwards AFB, CA has requested the following work to be performed at Building… $82,469 Edwards CA 1 0
Contract Replacing all lamps in existing interior fluorescent light fixtures. Provide and install new controls in office areas and mechanical rooms $83,822 Edwards CA 0 0
Contract ARRA - FFP Repair Roof Bldg 3920. Provide all labor, materials, equipment and supervision required to repair the built-up roof… $84,367 Edwards CA 7 0
Contract Construct Guard House Roof $91,208 Edwards CA 1 -4
Contract Site preparation, site earthwork, site improvements. $91,302 Edwards CA 1 -1
Contract Recovery - Paint/Wallpapaer Interior B6457. The contractor shall furnish all labor, material, equipment, and transportation to perform all work in… $94,313 Edwards CA 8 0
Contract Replacement of existing interior light fixtures and exterior light fixtures with new energy-efficent flurescent fixtures and the disposal of all… $103,812 Edwards CA 0 -1
Contract Recovery - RPR Roof Equip Research B8354. The contractor shall furnish all labor, material, equipment, and transportation to perform all… $106,282 Edwards CA 8 0
Contract Recovery - Repair Energy Cool Roof B8350. The contractor shall furnish all labor, material, equipment, and transportation to perform all… $109,035 Edwards CA 6 0
Contract REPAIR OF BOILER AT THE RESEARCH LABORATORY, BLDG. 8620, EDWARD AFB, CA. $111,708 Edwards CA 1 0
Contract Recovery - RPR Roof Cactus Cafe, Bldg 1610. The contractor shall furnish all labor, material, equipment, and transportation to perform… $113,408 Edwards CA 16 0