| Contract |
Advanced Metering installation and training |
$1,965,010 |
San Diego |
CA |
0 |
-1 |
| Contract |
Advanced Metering installation and training |
$2,609,487 |
San Diego |
CA |
0 |
0 |
| Contract |
Boiler Controls Installation and Testing, Installation Report, and Crew Training |
$93,620 |
San Diego |
CA |
0 |
0 |
| Contract |
Restore Interior Spaces for Mental Health Clinic and Deployment Health Center at Naval Medical Center San Diego |
$916,000 |
San Diego |
CA |
0 |
0 |
| Contract |
Project involves design, construction, and utility interconnection for Solar Photovoltaic (PV) Electrical Generating System. The PV array shall be installed… |
$1,910,197 |
San Diego |
CA |
0 |
1 |
| Contract |
Removal of three existing 250 KW inverters, incidental wiring and conduit. Installation of two new 500 KW inverters, new combiner… |
$692,307 |
San Diego |
CA |
15 |
1 |
| Contract |
Photovoltaic system at MCRD SAN DIEGO, CA |
$2,908,713 |
San Diego |
CA |
36 |
0 |
| Contract |
DEMOLISH EXISTING AUTOMATIC TRANSPORTATION SYSTEM (ATS) TO INCLUDE ELEVATORS, INSTALL NEW ATS TO INCLUDE ELEVATORS FOR DIETETICS AND LAUNDRY. |
$2,387,761 |
San Diego |
CA |
1 |
0 |
| Contract |
233280lbs Peanut Products |
$251,056 |
San Diego |
CA |
2 |
-2 |
| Contract |
Replace old, outdated, and more recent, high=water usage (one-gallon or more) urinals and flush valves with new, one-pint flush urinals… |
$2,131,100 |
San Diego |
CA |
0 |
0 |
| Contract |
CHILD CARE CENTER 24/7 |
$1,925,000 |
San Diego |
CA |
5 |
-1 |
| Contract |
Advanced Metering installation and training |
$6,597,901 |
San Diego |
CA |
0 |
-1 |
| Contract |
Advanced Metering installation and training |
$1,321,110 |
San Diego |
CA |
0 |
1 |
| Contract |
Recovery Project #M109BOILM, Replace Boilers Various Facilities, Marine Corps Air Station, Miramar |
$2,800,000 |
San Diego |
CA |
1 |
1 |
| Contract |
Recovery Project # TMA-N12 Restore aged & Deteriorated Cooling Towers, Naval Medical Center, San Diego, CA |
$339,118 |
San Diego |
CA |
0 |
0 |
| Contract |
Repair of Information Technologies vulnerabilities at Naval Medical Center, San Diego. Scope of work includes installing a new UPS System… |
$459,100 |
San Diego |
CA |
0 |
0 |
| Contract |
Lewis & Clark Lake Headwaters Aggradation Evaluation. The closure of Gavins Point Dam on the Missouri River at river mile… |
$352,437 |
San Diego |
CA |
1 |
1 |
| Contract |
REPLACE WINDOWS AND DOORS IN PATIENT WARDS PHASE 2 |
$387,000 |
San Diego |
CA |
1 |
0 |
| Contract |
Remove Headstones, Trench Excavation, Install Pre Cast Concrete Boxes, Pour Concrete Beam, Re-Install Headstone, Clean Headstones and Turf Renovation |
$2,201,960 |
San Diego |
CA |
9 |
0 |
| Contract |
427680lbs Peanut Products |
$428,073 |
San Diego |
CA |
2 |
0 |