| Contract |
Recovery: NCMP California Coastal Mapping, California Coast |
$7,370,909 |
San Diego |
CA |
7 |
0 |
| Contract |
New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt.… |
$8,345,848 |
San Diego |
CA |
0 |
0 |
| Contract |
IDIQ HVAC MACC Contract Recovert Project Number RM09-1452 Facility Energy Improvements (Phase 3-Boilers) |
$709,514 |
San Diego |
CA |
1 |
0 |
| Contract |
The American Recovery and Reinvestment Act of 2009, in part directs the Government to undertake infrastructure and energy projects, the… |
$4,165,711 |
San Diego |
CA |
52 |
1 |
| Contract |
In an effort to reduce electrical energy consumption at MCAS Miramar the existing parking lot lights adjacent to the air… |
$1,381,341 |
San Diego |
CA |
15 |
0 |
| Contract |
Housing Assistance Payments |
$366,016 |
San Diego |
CA |
4 |
-1 |
| Contract |
Water Multibeam and Side Scan Sonar Survey off the California coast. |
$2,998,163 |
San Diego |
CA |
2 |
1 |
| Contract |
Research and Development activities associated with the development of a proof of concept for the Arleigh Burke (DDG 51) Class… |
$37,727,170 |
San Diego |
CA |
17 |
1 |
| Contract |
INSTALL PHOTOVOLTAIC SYSTEM, NAVAL BASE SAN DIEGO |
$1,595,039 |
San Diego |
CA |
0 |
1 |
| Contract |
REPAIR AND MODERNIZE DDG1000 TRAINING FACILITY BUILDNG 3292 NAVAL BASE SAN DIEGO |
$3,882,325 |
San Diego |
CA |
0 |
0 |
| Contract |
The scope of work on this facility energy improvement project for the Navy consists of the demolition and removal of… |
$425,613 |
San Diego |
CA |
12 |
0 |
| Contract |
Cultural Resources Survey |
$17,980 |
San Diego |
CA |
1 |
1 |
| Contract |
Recovery Project #MI09BOILM Replace Boilers Various Facilities, Marine Corps Air Station Miramar |
$2,498,891 |
San Diego |
CA |
1 |
1 |
| Contract |
Recovery Project #RM09-1452, Facility Energy Improvements (Phase 3-HVAC), Naval Base Pt.Loma,CA |
$1,063,400 |
San Diego |
CA |
1 |
0 |
| Contract |
The Corps Water Management System (CWMS) is the automated hydrometeorologic data, modeling, and communication system used by the U.S. Army… |
$283,414 |
San Diego |
CA |
0 |
1 |
| Contract |
Acoustic Doppler Hand-held Portable Water Velocity / Flow Measurement System. 81 Handheld Flowtrackers; 15 Shallow Water Acoustic Dopplers; 3 Acoustic… |
$732,251 |
San Diego |
CA |
6 |
0 |
| Contract |
Equipment for the new physical building under construction to move all medical, dental and mental health services, as well as… |
$1,374,225 |
San Diego |
CA |
10 |
-5 |
| Contract |
2005 minimum standard detail requirements for ALTA/ACSM Land Title Surveys as adopted by American Land Title Association and National Society… |
$34,952 |
San Diego |
CA |
0 |
0 |
| Contract |
Design and Construction of Renovation of Building 3204 (Angelley Hall), a 71,727 sq. ft. bachelor housing barracks. Building 3204 consists… |
$10,006,127 |
San Diego |
CA |
0 |
0 |
| Contract |
METRO III, RECOVERY ACT ENERGY UPGRADES |
$1,840,605 |
San Diego |
CA |
5 |
0 |