| Contract |
Replace Roof Mounted Boilders and Improvements at Buildings 3144 and Building 3150 at Naval Base San Diego, California. |
$813,324 |
San Diego |
CA |
0 |
0 |
| Contract |
Advanced Metering installation and training |
$2,837,377 |
San Diego |
CA |
0 |
0 |
| Contract |
Otay Mesa Environmental Impact Statment to determine whether the proposed action warrants a finding of no significant impact or the… |
$290,221 |
San Diego |
CA |
1 |
-4 |
| Contract |
Advanced Metering installation and training |
$1,965,010 |
San Diego |
CA |
0 |
-1 |
| Contract |
Boiler Controls Installation and Testing, Installation Report, and Crew Training |
$93,620 |
San Diego |
CA |
0 |
0 |
| Contract |
Project involves design, construction, and utility interconnection for Solar Photovoltaic (PV) Electrical Generating System. The PV array shall be installed… |
$1,910,197 |
San Diego |
CA |
0 |
1 |
| Contract |
Photovoltaic system at MCRD SAN DIEGO, CA |
$2,908,713 |
San Diego |
CA |
36 |
0 |
| Contract |
233280lbs Peanut Products |
$251,056 |
San Diego |
CA |
2 |
-2 |
| Contract |
CHILD CARE CENTER 24/7 |
$1,925,000 |
San Diego |
CA |
5 |
-1 |
| Contract |
Advanced Metering installation and training |
$1,321,110 |
San Diego |
CA |
0 |
1 |
| Contract |
Recovery Project # TMA-N12 Restore aged & Deteriorated Cooling Towers, Naval Medical Center, San Diego, CA |
$339,118 |
San Diego |
CA |
0 |
0 |
| Contract |
Lewis & Clark Lake Headwaters Aggradation Evaluation. The closure of Gavins Point Dam on the Missouri River at river mile… |
$352,437 |
San Diego |
CA |
1 |
1 |
| Contract |
Remove Headstones, Trench Excavation, Install Pre Cast Concrete Boxes, Pour Concrete Beam, Re-Install Headstone, Clean Headstones and Turf Renovation |
$2,201,960 |
San Diego |
CA |
9 |
0 |
| Contract |
Recovery: NCMP California Coastal Mapping, California Coast |
$7,370,909 |
San Diego |
CA |
7 |
0 |
| Contract |
IDIQ HVAC MACC Contract Recovert Project Number RM09-1452 Facility Energy Improvements (Phase 3-Boilers) |
$709,514 |
San Diego |
CA |
1 |
0 |
| Contract |
In an effort to reduce electrical energy consumption at MCAS Miramar the existing parking lot lights adjacent to the air… |
$1,381,341 |
San Diego |
CA |
15 |
0 |
| Contract |
Water Multibeam and Side Scan Sonar Survey off the California coast. |
$2,998,163 |
San Diego |
CA |
2 |
1 |
| Contract |
INSTALL PHOTOVOLTAIC SYSTEM, NAVAL BASE SAN DIEGO |
$1,595,039 |
San Diego |
CA |
0 |
1 |
| Contract |
The scope of work on this facility energy improvement project for the Navy consists of the demolition and removal of… |
$425,613 |
San Diego |
CA |
12 |
0 |
| Contract |
Recovery Project #MI09BOILM Replace Boilers Various Facilities, Marine Corps Air Station Miramar |
$2,498,891 |
San Diego |
CA |
1 |
1 |