| Contract |
Equipment for the new physical building under construction to move all medical, dental and mental health services, as well as… |
$1,374,225 |
San Diego |
CA |
10 |
-5 |
| Contract |
The University of San Diego (USD) and Ocean Discovery Institute (ODI) are collaborating to develop a new generation of Ocean… |
$272,400 |
San Diego |
CA |
0 |
-11 |
| Contract |
Design and Construction of Renovation of Building 3204 (Angelley Hall), a 71,727 sq. ft. bachelor housing barracks. Building 3204 consists… |
$10,006,127 |
San Diego |
CA |
0 |
0 |
| Contract |
Increase services to extend hours to Saturdays from 9am to 2pm in two medical and two dental clinics. Increase jobs… |
$518,018 |
San Diego |
CA |
5 |
-10 |
| Contract |
FACILITY ENERGY IMPROVEMENTS (PHASE 3) |
$2,070,559 |
San Diego |
CA |
5 |
0 |
| Contract |
Appliances |
$264,696 |
San Diego |
CA |
0 |
-15 |
| Contract |
The American Recovery and Reinvestment Act of 2009, in part directs the Government to undertake infrastructure and energy projects, the… |
$3,924,266 |
San Diego |
CA |
52 |
0 |
| Contract |
RECOVERY - XUMU091128B2, Erosion Control, San Antonio Creek |
$81,653 |
San Diego |
CA |
1 |
0 |
| Contract |
The scope of work for this project consists of the design and construction of a Mycology Pressure Lab at Naval… |
$216,000 |
San Diego |
CA |
12 |
0 |
| Contract |
UPGRADE MEDICAL GAS SYSTEM AT BUILDING 1 - VAMC ROSEBURG |
$257,000 |
San Diego |
CA |
1 |
0 |
| Contract |
The Corps Water Management System (CWMS) is the automated hydrometeorologic data, modeling, and communication system used by the U.S. Army… |
$474,861 |
San Diego |
CA |
1 |
2 |
| Contract |
Replace Roof Mounted Boilders and Improvements at Buildings 3144 and Building 3150 at Naval Base San Diego, California. |
$813,324 |
San Diego |
CA |
0 |
0 |
| Contract |
Advanced Metering installation and training |
$2,837,377 |
San Diego |
CA |
0 |
0 |
| Contract |
Otay Mesa Environmental Impact Statment to determine whether the proposed action warrants a finding of no significant impact or the… |
$290,221 |
San Diego |
CA |
1 |
-4 |
| Contract |
Advanced Metering installation and training |
$1,965,010 |
San Diego |
CA |
0 |
-1 |
| Contract |
Boiler Controls Installation and Testing, Installation Report, and Crew Training |
$93,620 |
San Diego |
CA |
0 |
0 |
| Contract |
Project involves design, construction, and utility interconnection for Solar Photovoltaic (PV) Electrical Generating System. The PV array shall be installed… |
$1,910,197 |
San Diego |
CA |
0 |
1 |
| Contract |
Photovoltaic system at MCRD SAN DIEGO, CA |
$2,908,713 |
San Diego |
CA |
36 |
0 |
| Contract |
233280lbs Peanut Products |
$251,056 |
San Diego |
CA |
2 |
-2 |
| Contract |
CHILD CARE CENTER 24/7 |
$1,925,000 |
San Diego |
CA |
5 |
-1 |