| Contract |
Construct Central Chiller Loop, Bldg 5010 |
$115,176 |
Tucson |
AZ |
0 |
-3 |
| Contract |
Repair (upgrade) Controls, Multiple Facilities (Bldgs 1440, 2505, 129, 1630, 6000) |
$276,675 |
Tucson |
AZ |
0 |
-3 |
| Contract |
Construct Parking Lot Lighting, Bldgs 2300, 2301 and 2612 |
$167,940 |
Tucson |
AZ |
0 |
-1 |
| Contract |
Repair (Upgrade) Windows at Multiple Facilities (Bldg 4000) |
$89,930 |
Tucson |
AZ |
0 |
0 |
| Contract |
Repair HVAC, Multi Fac Heating Ventilation and Air Conditioning, Multiple Buildings. Furnish plant, labor, materials and equipment necessary. Replace the… |
$2,999,875 |
Tucson |
AZ |
0 |
-4 |
| Contract |
Phase-stabilized 1-GHz Fiber Laser Frequency Combs at 2-5 micron for coherent Fourier Transform Spectroscopy |
$89,977 |
Tucson |
AZ |
1 |
-1 |
| Contract |
Sunrise Park-Big Lake Road |
$4,956,800 |
Tucson |
AZ |
47 |
0 |
| Contract |
REPAIR ROOFS MUTLIPLE FACILITIES ON DAVIS-MONTHAN AFB, AZ |
$3,220,765 |
Tucson |
AZ |
2 |
0 |
| Contract |
Manufacture, deliver and install 8 prefabricated, precast concrete restroom buildings in the Coronado National Forest. |
$250,000 |
Tucson |
AZ |
0 |
0 |
| Contract |
Pavement Preservation Project on the Pascua Yaqui Tribe Reservation. |
$500,000 |
Tucson |
AZ |
0 |
0 |
| Contract |
San Xavier Landscaping |
$99,998 |
Tucson |
AZ |
0 |
-3 |
| Contract |
The continuation of concept development and test of a water-based, advanced Phase Change Material (PCM) heat sink is proposed. Utilizing… |
$599,992 |
Tucson |
AZ |
0 |
0 |
| Contract |
The Alaska District U.S. Army Corps of Engineers (Corps) is seeking to develop a subsistence evaluation framework, including a prototype… |
$399,690 |
Tucson |
AZ |
0 |
-2 |
| Contract |
Providing professional services for submittal review, answering of design and interpretation questions, review of invoices, claims by construction contractor, as-built… |
$14,714 |
Tucson |
AZ |
0 |
0 |
| Contract |
Advance the Near Infra-Red Camera development towards instrument engineering test unit delivery and flight unit assembly: - Complete Short Wave… |
$10,000,000 |
Tucson |
AZ |
91 |
-2 |
| Contract |
Project Number TU09PY001, Pascua Yaqui Pharmacy Renovation. Renovation of existing space at the clinic into a Pharmacy. |
$140,000 |
Tucson |
AZ |
0 |
0 |
| Contract |
Planning meeting for Prime Contractors in St. Louis and preparation of a Project Management Plan for the work to be… |
$98,702 |
Tucson |
AZ |
23 |
-1 |
| Contract |
Funding for Emergency Funding for basic assistance |
$166,260 |
Tucson |
AZ |
0 |
-1 |
| Contract |
This projects is issued as a Firm Fixed Price contract. The project shall include all plant, labor, equipment, and material… |
$534,695 |
Tucson |
AZ |
3 |
0 |
| Grant |
Arizona Bioscience Park |
$4,700,000 |
Tucson |
AZ |
0 |
-1 |