Below are the stimulus contracts, grants, and loans in this city. You can click on an award to read (and add to) its description. You can also discuss the award and vote on whether you are satisfied with it or not. For a more local view, you can drill down to awards in a particular city. Just choose a city from the following list.
The total of cost of all the projects submitted by Fort Huachuca is $3,881,813.86
| Type | Description | Amount | City | State | Jobs | Vote |
|---|---|---|---|---|---|---|
| Contract | Replace Boiler and Insulate | $73,994 | Fort Huachuca | AZ | 0 | 1 |
| Contract | REPLACE EVAP COLLING WITH AC BLDG 55332,55324,55332,55326,55334,55336,55338 FORT HUACHUCA AZ | $345,815 | Fort Huachuca | AZ | 1 | 1 |
| Contract | REPAIR WWTP DRYING BEDS | $732,200 | Fort Huachuca | AZ | 1 | 0 |
| Contract | Repair Sewer Line from MH 5-90 to 5-91. | $41,120 | Fort Huachuca | AZ | 0 | 0 |
| Contract | REPIPE 1.5MG RESERVOIR OVERFLOWS TO SEWER BLDG 22201 | $479,509 | Fort Huachuca | AZ | 1 | 0 |
| Contract | Painting Water Tank Bldg #61609 | $10,822 | Fort Huachuca | AZ | 10 | -1 |
| Contract | MECHANICAL,ELECTRICAL, PLASTER, PAINTING | $1,777,129 | Fort Huachuca | AZ | 3 | -1 |
| Contract | INSTALL WATER METERS | $421,225 | Fort Huachuca | AZ | 1 | -2 |