| Contract |
Work will consist of conducting a geoprobe investigation to collect soil and groundwater samples to further assess the extent of… |
$5,000 |
Anchorage |
AK |
0 |
0 |
| Contract |
Conduct a site assessment at the Hagadone facility on the Fort Peck Indian Reservation in Wolf Point, Montana. Site assessment… |
$23,409 |
Anchorage |
AK |
0 |
0 |
| Contract |
The objective of this project is to replace current card swipe access system with a proxy read type system at… |
$2,684,563 |
Anchorage |
AK |
0 |
0 |
| Contract |
ROOF LEAK REPAIR |
$98,768 |
Anchorage |
AK |
0 |
0 |
| Contract |
Tidal Datum Determinations for Small Boat Harbors in southeast Alaska. The scope of work is to do a tidal determination… |
$174,037 |
Anchorage |
AK |
5 |
-1 |
| Contract |
Construct a metal stud 2' x 6' fire rated 65' x 18'6' separation wall and wash room separating the office… |
$147,099 |
Anchorage |
AK |
5 |
0 |
| Contract |
Provide environmental services at the Boivin site on the Menominee Reservation in Neopit, Wisconsin. Work includes assessing the existing non-operating… |
$15,000 |
Anchorage |
AK |
0 |
0 |
| Contract |
Work will consist of conducting a site assessment to determine if underground storage tanks are present and if so, if… |
$5,000 |
Anchorage |
AK |
0 |
0 |
| Contract |
Provide environmental services for the Evan's Chevron site located on the Blackfeet Indian Reservation in Browning, Montana. Work consists of… |
$27,337 |
Anchorage |
AK |
0 |
0 |
| Contract |
Remove lead paint from hangar door and concrete walls on north end of building. Surface prep and paint metal siding… |
$458,931 |
Anchorage |
AK |
8 |
0 |
| Contract |
Drew Point Well Test # 1 Remediation |
$15,588,460 |
Anchorage |
AK |
0 |
0 |
| Contract |
The overall purpose of this portion of the Study is to produce a comprehensive assessment of data, knowledge, and information… |
$98,819 |
Anchorage |
AK |
0 |
0 |
| Contract |
Renovate and modernize the Welcome Center for Family Support. Remove 4,031 SF vinyl asbestos tile and mastic, on concrete substrate,… |
$39,071 |
Anchorage |
AK |
4 |
0 |
| Contract |
TAS Recovery- Aleutians East Borough Energy Efficiency & Conservation Project |
$50,000 |
Anchorage |
AK |
0 |
0 |
| Contract |
Work will consist of finalizing and implementing the Site Closure Plan at the Bovey Oil site on the Nez Perce… |
$256,449 |
Anchorage |
AK |
0 |
0 |
| Contract |
Red Devil Petroleum Release Investigation |
$808,100 |
Anchorage |
AK |
0 |
0 |
| Contract |
Repair Potable Water System (Asbestos Abatement), Building 796, Fort Richardson, Alaska. The contractor shall furnish all supervision, labor, materials, and… |
$50,817 |
Anchorage |
AK |
4 |
0 |
| Grant |
Aleutian Housing New Construction and Rehabilitation |
$1,375,486 |
Anchorage |
AK |
4 |
0 |
| Grant |
Bering Sea Sub Network: A Distributed Human Sensor Array to Detect Arctic Environmental Change |
$2,499,989 |
Anchorage |
AK |
3 |
0 |
| Grant |
Nanwalek Rentals, Port Graham Single Family, Seward Rehabilitation |
$1,190,351 |
Anchorage |
AK |
9 |
0 |