GILBERTVILLE, MA

MASSACHUSETTS, COMMONWEALTH OF

Grant: $3,590,569 - Federal Highway Administration - Mar. 12, 2009

Are you satisfied with this award? or

No votes have been cast for this award yet

Join the conversation: Post a comment about this award


Award Description: ERVING-GILL ORANGE-WENDELL RESURFACING AND RELATED WORK ON ROUTE 2 Work under this project will consist of milling the existing paved surface and repaving with 2' of HMA modified top course material. Work will also include repairs/upgrades to guardrail end treatments and sidewalk wheelchair ramps along with new pavement markings. The project limits are as follows: Route 2 from mm 52.9 to 56.59 for a length of 3.69 miles; Mohawk Trail from mm 60.21 to 63.76 for a project length of 3.55 miles.

Project Description: Contract has been awarded and project has advanced beyond 50% of scheduled construction

Infrastructure Description: Invest in transportation infrastructure.

Jobs Summary: Jobs associated with this project are typical to the road construction industry and include skilled and unskilled laborers, masters in the building trades, apprentices and trainees, road flaggers, equipment operators and truck drivers. At the time of report there was a total of 85 people working on this project. (Total jobs reported: 7)

Project Status: More than 50% Completed

This award's data was last updated on Mar. 12, 2009. Help expand these official descriptions using the wiki below.


Funds Recipient

MASSACHUSETTS, COMMONWEALTH OF
BOSTON, MA 02108
See more awards to this recipient

Place of Performance

French King Highway
Erving, MA 01031
See more awards in this zip code



Wiki Description

No comments have been added for this project.

Edit the Wiki Description (editing policy)


Post a comment